-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Lake Gregory. Final report at licence full surrender, for the period 13/5/2016 to 9/3/2017.
A licence area covering a large salt lake (Lake Gregory) of the Cenozoic Lake Eyre Basin, and the underlying Mesozoic Eromanga Basin sediments situated to the north of the uranium-rich Mount Babbage and Mount Painter inliers, ~120 km north-east of...-
Document
-
Merty Merty (part of the Big Lake Project). Final report for approved geophysical program, Project ADI RD01-109 [part of Accelerated Discovery Initiative Round 1, 2021].
An ADI funds grant of ~A$152,400 has been provided to Alligator Energy to assist it with conducting further greenfields exploration for in situ recoverable secondary uranium mineralisation that may have formed within Tertiary cover sediments in the...-
Document
Published: 20 Aug 1921
-
Toolaby. Combined first progress / final report to licence surrender for the period 24/2/1969 to 23/11/1969.
During September 1969 the licensee drilled and geophysically logged 11 open rotary holes totalling 1611 feet along two north-south traverses in a search for possible economic Mesozoic or Tertiary palaeochannel-hosted sedimentary uranium, within an...-
Document
Published: 06 Oct 1969
-
Oil Prospecting Licence 4, Lake Cootabarlow area. Progress reports to licence full surrender, for the period 18/11/1948 to 9/1/1950, plus technical correspondence and results of drill sample analyses, as later submitted to the SA Department of Mines.
A 50 square mile area centred immediately south-southeast of Lake Cootabarlow, and lying ~12 miles south of the Moolawatana 1 water bore, was taken up by Australian - based holding company Frome - Broken Hill Co. Pty Ltd as an Oil Prospecting Licence...-
Document
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Progress and final reports to licence re-issue over a stand-alone area, for the period 13/7/1976 to 12/9/1977.
TARGET: Evaluation of the Honeymoon deposit. EXPLORATION: Drilling of 3 cored holes and the conduct of a push-pull in-situ leaching test programme, plus contractor laboratory hydrometallurgical testing and consultants' hydrological investigations.-
Document
Published: 04 Jan 1978
-
Lake Frome South and Lake Frome North (the Wertaloona Project). Joint annual reports to licences' surrender, for the period 8/11/2010 to 3/9/2013.
The southern half of Lake Frome salina, centred about 80 km south-southeast of the Beverley uranium mine, has been explored for possible commercial quantities of dissolved lithium and uranium. Interest in the former commodity was engaged by the...-
Document
Published: 11 Oct 1913
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
3D conceptual modelling to aid exploration in the southern Callabonna Sub-basin.
Mineral exploration in the northern Curnamona Province is made difficult by a cover of weathered Cainozoic sediments up to 200 m or more thick, overlying weathered Proterozoic bedrock of the Broken Hill and Olary Domains. Four projects have been...-
Document
-
Lake Frome. Progress and final reports to licence surrender for the period 13/11/1978 to 12/5/1980.
As part of a wider search over SA for possible continental salt lake occurrences of NaCO3-rich brines and of fossil crystalline trona beds, presumed to be equivalent to the Lake Magadi (Kenya) / Green River Basin (Utah - Wyoming) style Tertiary...-
Document
Published: 30 Apr 1980
-
Mount Distance. Progress reports to licence expiry/renewal for the period 13/1/1972 to 12/1/1973.
Exploration for possible sedimentary uranium deposits of Lake Frome type hosted within anticipated buried Quaternary, Tertiary or Jurassic palaeochannels in the Mount Distance area, 60 km east-northeast of Lyndhurst, has included reconnaissance and...-
Document
Published: 13 Jan 1973
-
Paralana Hill. Progress and technical reports to licence expiry/renewal for the period 23/9/1975 to 22/9/1977.
As part of ongoing regional Tertiary stratigraphic appraisal work, an area located to the south and east of the Beverley uranium deposit was explored for economic roll-front style sedimentary uranium mineralisation by conducting resistivity surveys...-
Document
Published: 06 Jul 1977
-
EL 203, 209 and 210. Lake Frome Embayment, SA. Geochemical survey data (1976). A review.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
Prescott Point. Progress and final reports to licence surrender for the period 8/12/1980 to 23/6/1981.
Exploration for possible economic trona deposits thought to have formed within Cainozoic near-surface sediments, in an area of thick lacustrine sedimentation located 80 km north of Marree, consisted only of a consultant's review of available...-
Document
-
Lake Frome. Progress reports for the period 3/10/1968 to 9/6/1971.
TARGET: Uranium in Tertiary sediments. EXPLORATION: 56 rotary drillholes for a total of 31,690 feet. All drillholes were geophysically logged. Samples from selected water bores were analysed for radon and uranium. RESULTS: All drillholes ended in...-
Document