-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
RB 84/00028 Petrography of 25 specimens from Mount Grainger Goldfield.
Specimens from the Mt Grainger Goldfield include quartzites, sandstones in which kaolinite is believed to represent earlier feldspar, siltstones, shales, diamictites of probable glaciogene origin, granitoids and andesites. Low to moderate temperature...-
Document
Published: 01 May 1984
-
RB 78/00141 Golden Grove construction materials survey, Hd Yatala, Co. Adelaide.
Major source of construction materials for metropolitan Adelaide, currently supplies 25% of natural construction sand, 60% of white plastic clay and 45% of brick shale. 2 brick works produce 63 million bricks annually. Total reserves of 85 million...-
Document
Published: 01 Jan 1978
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-63, Mongolata area epithermal gold and base metal mineral prospects. Project final report.
An observed trend between base metals anomalism in soils and previously identified magnetic and gravity anomalies within inferred Adelaidean basement metasediments present within the eastern part of Mongolata EL 3164 provided the impetus for the...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Prince Alfred mine. First annual report to licence full surrender and re-issue as part of a larger tenement, for the period 26/10/1996 to 9/4/1998.
Assays of tailings heaps at the Prince Alfred Mine, located 40 km north-east of Carrieton, returned 1-1.5% Cu. Up to 12.7 % Cu was recorded from rock sampling, and elevated Au and anomalous Cu were recorded in calcrete samples. Four areas of...-
Document
Published: 15 Dec 1997
-
Reaphook Hill and Mount Frome (a tenement group having amalgamated expenditure commitments, which is part of the Flinders Ranges Project). Joint annual reports for the period 4/8/2001 to 1/7/2015.
During the third year of exploration nominally ending on 1/7/2002 [and subsequent to the starting date of 5/3/2002 for the application of provisions of the Flinders Ranges Project's multi-tenement Amalgamation of Expenditure Agreement (AEA), whence...-
Document
Published: 07 Aug 1915
-
Data release [made at SA Director of Mines’ discretion] : Black Hill. Annual reports to licence expiry/renewal, for the period 26/8/2003 to 25/8/2008.
Inco Resources ('Inco') has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation. This work commenced on 30/9/2004, when it...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Mount Playfair. Progress and final reports to licence surrender for the period 28/3/90 to 24/5/91.
TARGET: Possible diamonds and diapir-associated copper mineralisation in an area extending south and west from Lyndhurst. EXPLORATION: Drainage geochemical and gravel sampling, ground magnetic and IP surveys, and percussion and shallow RAB drilling of...-
Document
Published: 04 Jun 1991
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
The Murray Basin Project. Joint progress reports and joint final report to remnant licences' full surrender, for the period 7/10/1980 to 6/12/1984.
Thirteen contiguous exploration licences located along the western margin of the Tertiary Murray Basin were taken up by CRA to search for economic buried brown coal / lignite deposits of the type already known from small discoveries that had been made...-
Document
Published: 07 Mar 1985
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document