RB 90/00030 Duntroon geophysical study.
The Duntroon Basin is located in the centre of the Southern Rift System between the Bight and the Otway Basins, west and SW of Kangaroo Island. It is limited to the north by the Proterozoic Gawler Craton. The formation of the basin is related to the...-
Document
Published: 01 Dec 1990
-
1974 Shell R 8 Marine Seismic Survey. Reports for the period 26/10/1973 to 27/8/1974.
There is no abstract created for this record-
Document
-
Final (operations) report, (1974 R 8) Marine Seismic Survey, SA offshore.
AIM: This 24-fold reconnaisance survey of Shell's deepwater (i.e. greater than 1000 metres water depth) Great Australian Bight exploration acreage was designed to gather good quality seismic reflection data to allow more accurate mapping of structural...-
Document
-
1969 marine seismic survey, R 4, final report.
AIM:To define a pre-Tertiary unconformity recognised in the southeastern, shallow water (Duntroon) area of Shell's offshore acreage using semi-detailed, long offset profiling of the continental shelf, and to extend seismic control northwestwards into...-
Document
Published: 22 Apr 1971
-
EPP 6, Eucla and western Duntroon Basins. Progress, technical and relinquishment reports for the period 20/9/68 to December 1975.
The programme of work pursued over EPP 6 was as follows: Permit Year 1 - interpretation of 566 line km of regional reconnaisance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
-
EPP 5. 1973 evaluation report.
Following an unsuccessful attempt at farming out part of EPP 5 in late 1972, Shell resolved to continue exploring that permit area in its own right, subject to the offshore Designated Authority's approval of a variation in permit conditions, which was...-
Document
-
1995 marine seismic survey, HD95, final report.
AIM: To obtain detailed coverage of potential drilling prospects, and add to the regional grid over the permit area. Work would initially focus on the Rocky strong lead, the main permit Year 6 drilling candidate, and then embrace the remaining six...-
Document
-
1992 DH92 Marine Seismic Survey, EPP 26. Reports.
There is no abstract created for this record-
Document
-
1970-1971 Shell R 5 Marine Geophysical Survey on Petroleum Titles SA-5, SA-6, SA-10 and SA-11. Reports for the period 25/8/1970 to 9/3/1972.
AIM: Shell's R 5 Marine Geophysical (seismic plus magnetic) Survey, the most extensive yet conducted in the SA offshore, was spread over its entire concession area. The object of the seismic work was to define and confirm prospects for drilling in...-
Document
Published: 09 Mar 1972
-
1972-73 marine seismic survey (part of), M/V Petrel, final report.
This report represents an evaluation by Shell's deep water exploration team of geophysical data collected during the 1972-73 survey by the MV Petrel in southern Australia. The Petrel survey was conducted with the object of investigating the...-
Document
-
1982 marine seismic survey, Aywon, final report.
AIM:To obtain regional reconnaisance seismic information to provide support in the reprocessing and reinterpretation of existing data, and to try to broadly identify potential drillable structures within the EPP 19 area and link them to existing well...-
Document
-
1982 Great Australian Bight Scientific Investigation Survey [GSI speculative marine seismic survey], offshore South Australia. Reports.
AIM: On 30 April 1982 the contractor firm Geophysical Service,Inc. applied to SADME for permission to conduct a short, speculative reconnaissance seismic survey across the Great Australian Bight region, commencing in early May. The proposed coverage...-
Document
Published: 01 Jan 1989
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
EPP 7, Eucla and eastern Duntroon Basins. Progress, technical and relinquishment reports for the period 9/1/69 to 8/1/76.
EPP 7 was granted to Shell on 9/1/69 for an initial term of 5 years, for an area extending over 371 graticular blocks covering 23,673 square km, adjacent to southern Eyre Peninsula and the west coast of Kangaroo Island. Combined with EPPs 5, 6, 10...-
Document