-
Lake Bring. Quarterly reports, first joint annual report (with SML 710) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
TARGET: Sedimentary uranium associated with high order radiometric anomalies over lakes on the edge of the sand dune country, east of the Nullarbor Plain. EXPLORATION: Closely spaced (300-500 m), low level (65 m altitude) aerial scintillometer...-
Document
Published: 26 Jun 1973
-
RB 81/00005 Stratigraphy of the TARCOOLA 1:250 000 map sheet area.
Brief summary progress report.-
Document
Published: 01 Jan 1981
-
RB 79/00114 Palaeodrainage systems in western South Australia. Their detection by Landsat imagery, stratigraphic significance and economic potential.
Two major palaeodrainage systems of Tertiary age, with watersheds of up to 35 000 square km and channel lengths of 200-250 km, have been recognised and delineated using LANDSAT imagery, during 1:250 000 scale geological mapping in western South...-
Document
Published: 01 Jan 1980
-
RB 89/00058 Helicopter survey of the geology of the BARTON and TARCOOLA 1:250 000 map sheets.
Isolated outcrops of Archaean to Early Proterozoic basement and Phanerozoic cover were visited by helicopter over BARTON and the western part of TARCOOLA in May 1988. This report summarises the technical and costing aspects of the survey, and...-
Document
Published: 01 May 1989
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Garford. First annual report plus final report to licence expiry/full surrender, for the period 16/4/2018 to 15/4/2020.
An area centred ~140 km north-west of Tarcoola and ~20 km north of the Challenger gold mine has been explored for possible economic high grade occurrences of palygorskite (synonym attapulgite) clays which may have formed in Tertiary palaeochannels and...-
Document
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Garford Homestead. Progress and final reports to licence expiry for the period 12/4/1983 to 11/4/1984.
After a regional review of the absorbent clay mineral potential of known palygorskite and attapulgite - bearing Middle Tertiary palaeochannel sediments in an area centred 110 km south-west of Coober Pedy, a possibly economic partly-exposed attapulgite...-
Document
Published: 21 Jun 1984
-
Wirrulla, Cungena, Mortana, Kolballa and Calca. Joint progress reports and joint final report to licences' joint full surrender, for the period 18/8/1989 to 17/12/1991.
TARGET: Possible heavy mineral sands emplaced within Tertiary sediments in the Wirulla, Poochera, Inkster and Streaky Bay areas. EXPLORATION: Reconnaissance 10-15 km spaced and infill 100 m spaced reverse circulation drilling to pre-Tertiary basement...-
Document
-
Lake Anthony and Lamont. Progress and relinquishment reports for the period 12/4/82 to 11/4/85.
Literature reviews, plus studies of photogeology and of drillhole data, have confirmed the existence of palaeochannels and of the selective accumulation of Tertiary lignites within a broad area that surrounds and lies to the north and west of Lake...-
Document
-
Nalara and Pulkatha. Progress and final reports for the period from 29/9/88 to 28/3/90.
TARGET: Heavy mineral sands in the Eocene Hampton Sandstone of the Eucla Basin. EXPLORATION: A review of Landsat data, aerial photographs and topographic maps to located fossil Tertiary coastal strandlines, plus reverse circulation drilling (97 holes...-
Document
Published: 11 Apr 1990
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
RB 00843 Geology of the Maralinga area, South Australia.
Maralinga is located on the crest of the Ooldea Range, an ancient (Tertiary) coastal dune which is bounded to the south by the Nullarbor Plain and to the north by Tietkens Plain. The dune field of the Great Victoria Desert covers much of the region...-
Document
-
RB 00855 Maralinga hydrogeological and geotechnical site investigation - Stage 1.
Hydrogeological and geotechnical information is provided for a comparative cost study of competing proposals for the permanent disposal of soil lightly contaminated with nuclear materials. A total of 19 open boreholes and 6 cored boreholes were...-
Document
-
Gawler Project Central Tenement Block [Part] Uranium exploration joint venture areas. Data release made at subsequent licences' surrender: farminee Deep Yellow annual reports for the period 1/7/2006 to 30/6/2008.
For two years Deep Yellow has been exploring for possible economic sedimentary uranium deposits on four of Dominion Gold's mineral exploration tenements in the central Gawler Craton, under the terms of a joint venture agreement signed on 22/2/2006....-
Document
-
Half Moon Lake (part of the Eucla Project). First partial surrender report for the period 17/2/2005 to 16/2/2009.
An area located approximately 120 km north-west of Tarcoola and immediately to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Indooroopilly Outstation (part of the Eucla Project). First partial surrender report for the period 12/6/2003 to 14/7/2009.
An area located approximately 160 km south-west of Coober Pedy and just to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document