-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Frome. Annual reports for the period 18/10/2013 to 17/10/2016.
An area abutting the south-western edge of Lake Frome and the southern boundary of the Gammon Ranges National Park, that is centred ~60 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone...-
Document
Published: 09 Dec 2016
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 2012
-
Data release - as updated : Reaphook Hill. Licence-specific annual reports to the commencement of Frome Basin Project joint reporting, plus final report to licence expiry/full surrender, for the overall period 24/7/2013 to 11/1/2022.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 06 Jul 2021
-
Lake Labyrinth. Final report [letter] at licence full surrender, for the period 17/12/2009 to 12/4/2019.
The only exploration work undertaken during the tenure of this licence was the acquisition during August 2013, and subsequent data processing and interpretation, of part of a helicopter-borne aerial geophysical survey which was flown over two...-
Document
Published: 15 Apr 2019
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 2010
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 2016
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 2013
-
Curdimurka. First partial surrender report, for the period 4/9/2014 to 3/9/2017.
A large part, ~79%, of a predominantly Recent sediment - covered licence area abutting the southern shore of Lake Eyre South between Bopeechee and Curdimurka has been relinquished. This ground, which had been taken up to explore for possible buried...-
Document
Published: 23 Nov 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Brady. Annual reports to licence expiry/renewal, for the period 25/1/2010 to 24/1/2015.
An area centred over the central Coober Pedy Ridge tectonic feature, 28 km east-southeast of Coober Pedy township, is being explored for possible economic buried massive haematite and magnetite within banded iron formation (BIF) type iron ore...-
Document
Published: 05 Mar 2015
-
Western River Cove and Western River (part of the Kangaroo Island Project). Final report at licences' joint full surrender, for the period 22/5/2003 to 16/7/2014.
No work was undertaken on EL 4530 Western River Cove during the whole 4-year term of its tenure. EL 3088 Western River was purchased from Havilah Resources by Monax Mining in July 2005, and formed part of Monax’s package of tenements included in the...-
Document
Published: 17 Dec 2014
-
Diesel Dam. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
The Palaeoproterozoic Yarlbrinda Shear Zone is a broad and complex structure, which has both southwards and south-eastwards trending components that bifurcate near Tunkillia. The structure was a conduit for Mesoproterozoic hydrothermal fluids...-
Document
Published: 27 Jan 2015
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-19 - Golden Cross Operations Pty Ltd, Coober Pedy Project, G2 Lineament Corridor gravity/magnetic anomaly IOCG targets. Drilling project final report.
Golden Cross Operations Pty Ltd ('Golden Cross') commenced mineral exploration activities in South Australia with the objective of discovering significant IOCG deposits with the potential to support a major mining operation. In mid-2009, four tenement...-
Document
Published: 25 Nov 2013
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 2013
-
Data release [made at SA Director of Mines’ discretion] : Katchiwilleroo Dam. First annual report to 26/6/2003, plus first partial surrender report for the period 27/6/2002 to 26/6/2003.
An area located on the southern margin of the Frome Embayment has been acquired to explore for Tertiary roll-front sedimentary uranium deposits. Within the Frome Embayment this style of mineralisation has been sought since 1969, and the Goulds Dam...-
Document
Published: 15 Sep 2003
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 2018
-
Barton. First partial surrender report, for the period 18/1/2006 to 28/9/2015.
Two parts comprising 50% of a licence located 130 km north of Fowlers Bay and immediately south of the Trans Australia Railway, in the vicinity of Barton Siding, have been relinquished due to their perceived diminished potential for finding economic...-
Document
Published: 15 Dec 2015
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 2017
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Drennans Hut. Annual reports plus final report to licence full surrender, for the period 19/8/2013 to 5/6/2019.
An area in the south-west of the Frome Embayment, that was centred ~16 km south-southeast of Reaphook Hill, was taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation which might...-
Document
Published: 22 Jul 2019