-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 2010
-
Peltabinna Hill. Annual reports, plus final report to licence expiry/full surrender, for the period 2/5/2013 to 1/5/2017.
An area located along the south-south-western margin of the Gawler Ranges volcanic province has been explored for possible economic buried copper-gold and/or base metal mineralisation which might have been emplaced during the early stages of the...-
Document
Published: 29 May 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 2013
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 2013
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 2017
-
Copper Coast. Final report, Project ADI RD02-291 [Accelerated Discovery Initiative Round 2, 2022].
IGO Ltd’s (IGO) Copper Coast Project is located along the eastern margin of the Gawler Craton in South Australia and covers Proterozoic rocks of the Stuart Shelf, Torrens Hinge Zone and Adelaide Rift Complex, which form part of the Adelaide...-
Document
Published: 09 May 2022
-
Data release [made at SA Director of Mines' discretion] : Wilkatana Project. First annual report for the period 26/11/2015 to 25/11/2016 and annual reports for Kallioota to expiry 25/11/2022.
A large multi-licence project area skirting the south-eastern and southern sides of Lake Torrens is being explored for economic buried deposits of base metals. This area is considered prospective on the basis of known mineral occurrences, proximity to...-
Document
Published: 25 Nov 2022
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 2006
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-13, Lake Frome area Holocene and Neogene calcrete - hosted uranium mineral prospects. Project interim and final reports.
Surficial sedimentary uranium deposits are estimated to comprise about 4% of world uranium resources. Calcrete deposits form approximately 5% of Australia's total uranium reserves and resources. Exploration for calcrete - hosted uranium of Neogene age...-
Document
Published: 11 Jun 2008
-
Data release [made at SA Director of Mines' discretion] : Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2007 to 28/2/2011.
A group of adjoining tenements covering ground situated between Ceduna and the Trans Australia Railway are being explored for possible economic buried Tertiary marine placer deposits of heavy mineral sands. During the 2007-2008 joint reporting year,...-
Document
Published: 01 May 2011
-
Data release - as updated [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports for the period 8/4/2009 to 14/4/2019.
During the 2009-2010 reporting year, as part of the strategy to significantly advance the future development of the Hawks Nest Iron Ore Project, Western Plains Resources (WPG) successfully concluded a series of complex joint venture negotiations with...-
Document
Published: 01 Jun 2018
-
Reaphook Hill and Mount Frome (a tenement group having amalgamated expenditure commitments, which is part of the Flinders Ranges Project). Joint annual reports for the period 4/8/2001 to 1/7/2015.
During the third year of exploration nominally ending on 1/7/2002 [and subsequent to the starting date of 5/3/2002 for the application of provisions of the Flinders Ranges Project's multi-tenement Amalgamation of Expenditure Agreement (AEA), whence...-
Document
Published: 07 Aug 2015
-
Apoinga. First partial surrender report for the period 5/11/2007 to 4/11/2009.
EL 3972 - Apoinga occurs within the northern Mount Lofty Ranges, where the exposed bedrock comprises Neoproterozoic rocks of the Adelaide Fold Belt. The main feature of interest to Copper Range within its licence area is the Tarnma Anticline, which is...-
Document
Published: 19 Apr 2010
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 2019
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 2012
-
Data release - as updated : Castle Rock. Annual reports to licence full surrender, for the period 17/3/2009 to 14/1/2016.
Exploration for possible economic concealed Beltana mine type stratabound lead-zinc-(silver) mineralisation, and for other diapiric and associated basic igneous intrusion - related base metal and/or gold occurrences, was carried out over a small area...-
Document
Published: 20 Jan 2016
-
Water for Infrastructure Corridors – Phase 1, Torrens Basin groundwater investigation.
The Water for Infrastructure Corridors Initiative is a project funded through the Economic and Business Growth Fund and is a collaboration between the Department for Environment and Water, the Department for Infrastructure and Transport and the...-
Document
-
RB 2018/00010 Characterising and mapping alteration in the Punt Hill region - a data integration project.
South Australia’s Olympic Cu-Au Province hosts some of the world’s great iron oxide copper gold (IOCG) deposits, such as Olympic Dam, Prominent Hill and Carrapateena. The same causative thermal event resulted in variants of this deposit class being...-
Document
Published: 01 May 2018
- ZIP,