Lake Bring. Quarterly reports, first joint annual report (with SML 710) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
TARGET: Sedimentary uranium associated with high order radiometric anomalies over lakes on the edge of the sand dune country, east of the Nullarbor Plain. EXPLORATION: Closely spaced (300-500 m), low level (65 m altitude) aerial scintillometer...-
Document
Published: 26 Jun 1973
-
RB 79/00114 Palaeodrainage systems in western South Australia. Their detection by Landsat imagery, stratigraphic significance and economic potential.
Two major palaeodrainage systems of Tertiary age, with watersheds of up to 35 000 square km and channel lengths of 200-250 km, have been recognised and delineated using LANDSAT imagery, during 1:250 000 scale geological mapping in western South...-
Document
Published: 01 Jan 1980
-
RB 78/00038 Report on drilling in the Tallaringa palaeodrainage system.
Programme of fully cored shallow holes. Aim was to investigate stratigraphy of the palaeochannels, relate this to the geology and evaluate economic potential of channel confined sediments, to test for lignite, sedimentary uranium, alluvial gold, heavy...-
Document
Published: 01 Jan 1978
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 1910
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Mulgathing. First partial surrender report, for the period 30/7/2019 to 29/7/2020.
An area centred ~50 km west-northwest of Tarcoola is being explored for possible economic palaeochannel - hosted secondary uranium deposits, as well as for possible hydrothermal gold mineralisation which may have been emplaced within siliciclastic...-
Document
Published: 28 Sep 1920
-
Data release - as updated [made at SA Director of Mines' discretion] : Aurora Tank and Indooroopilly Outstation. Joint annual reports for the period 21/3/2011 to 20/3/2013.
Two separate tenements in the Challenger district which are now wholly owned by Marmota Energy Limited are being explored for possible economic buried Challenger style gold mineralisation that may be present within Archaean basement, and also, within...-
Document
Published: 12 Jul 1913
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
Drilling programme no. 1. EL 413, Wilkinson Lakes area, SA.
A total of 48 holes (3213 metres) included 21 holes to define the structure and position of the Karari Fault zone, 19 holes across Tertiary palaeochannel systems, 1 hole on the side of a palaeodrainage channel to test for water for Commonwealth Hill...-
Document
Published: 01 Jan 1979
-
Gawler Project Central Tenement Block [Part] Uranium exploration joint venture areas. Data release made at subsequent licences' surrender: farminee Deep Yellow annual reports for the period 1/7/2006 to 30/6/2008.
For two years Deep Yellow has been exploring for possible economic sedimentary uranium deposits on four of Dominion Gold's mineral exploration tenements in the central Gawler Craton, under the terms of a joint venture agreement signed on 22/2/2006....-
Document
-
Tallaringa South area. Annual reports plus final report to licence full surrender, for the period 10/9/2007 to 20/6/2014.
An area centred ~120 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within eastwards-draining tributaries of the Tertiary Garford Palaeochannel. This...-
Document
Published: 21 Jul 1914
-
Garford. Annual reports plus final report to licence full surrender, for the period 17/11/2008 to 20/6/2014.
An area centred ~160 km southwest of Coober Pedy, that is located on and immediately south of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the Permian to Tertiary sediment-filled Tallaringa...-
Document
Published: 21 Jul 1914