-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Garford Homestead. Progress and final reports to licence expiry for the period 12/4/1983 to 11/4/1984.
After a regional review of the absorbent clay mineral potential of known palygorskite and attapulgite - bearing Middle Tertiary palaeochannel sediments in an area centred 110 km south-west of Coober Pedy, a possibly economic partly-exposed attapulgite...-
Document
Published: 21 Jun 1984
-
Sandstone. Partial surrender report for the period 19/12/1986 to July 1987.
No technical data. Exploration is for palygorskite - bearing clays of the Garford Formation.-
Document
-
Wirrulla, Cungena, Mortana, Kolballa and Calca. Joint progress reports and joint final report to licences' joint full surrender, for the period 18/8/1989 to 17/12/1991.
TARGET: Possible heavy mineral sands emplaced within Tertiary sediments in the Wirulla, Poochera, Inkster and Streaky Bay areas. EXPLORATION: Reconnaissance 10-15 km spaced and infill 100 m spaced reverse circulation drilling to pre-Tertiary basement...-
Document
-
Lake Anthony and Lamont. Progress and relinquishment reports for the period 12/4/82 to 11/4/85.
Literature reviews, plus studies of photogeology and of drillhole data, have confirmed the existence of palaeochannels and of the selective accumulation of Tertiary lignites within a broad area that surrounds and lies to the north and west of Lake...-
Document
-
Nalara and Pulkatha. Progress and final reports for the period from 29/9/88 to 28/3/90.
TARGET: Heavy mineral sands in the Eocene Hampton Sandstone of the Eucla Basin. EXPLORATION: A review of Landsat data, aerial photographs and topographic maps to located fossil Tertiary coastal strandlines, plus reverse circulation drilling (97 holes...-
Document
Published: 11 Apr 1990
-
Sandstone. Progress reports for the period 18/12/86 to 18/12/90.
TARGET: Palygorskite (absorbent clay) in playa lakes within the Garford Palaeochannel. EXPLORATION: Trenching and 10-20 kg bulk sampling of known dolomitic palygorskite occurrences (15 backhoe cuts in seven lake depressions, to 3.6 m below surface,...-
Document
Published: 12 Dec 1990
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
Drilling programme no. 1. EL 413, Wilkinson Lakes area, SA.
A total of 48 holes (3213 metres) included 21 holes to define the structure and position of the Karari Fault zone, 19 holes across Tertiary palaeochannel systems, 1 hole on the side of a palaeodrainage channel to test for water for Commonwealth Hill...-
Document
Published: 01 Jan 1979
-
RB 00843 Geology of the Maralinga area, South Australia.
Maralinga is located on the crest of the Ooldea Range, an ancient (Tertiary) coastal dune which is bounded to the south by the Nullarbor Plain and to the north by Tietkens Plain. The dune field of the Great Victoria Desert covers much of the region...-
Document
-
RB 00855 Maralinga hydrogeological and geotechnical site investigation - Stage 1.
Hydrogeological and geotechnical information is provided for a comparative cost study of competing proposals for the permanent disposal of soil lightly contaminated with nuclear materials. A total of 19 open boreholes and 6 cored boreholes were...-
Document
-
Gawler Project Central Tenement Block [Part] Uranium exploration joint venture areas. Data release made at subsequent licences' surrender: farminee Deep Yellow annual reports for the period 1/7/2006 to 30/6/2008.
For two years Deep Yellow has been exploring for possible economic sedimentary uranium deposits on four of Dominion Gold's mineral exploration tenements in the central Gawler Craton, under the terms of a joint venture agreement signed on 22/2/2006....-
Document
-
Half Moon Lake (part of the Eucla Project). First partial surrender report for the period 17/2/2005 to 16/2/2009.
An area located approximately 120 km north-west of Tarcoola and immediately to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Indooroopilly Outstation (part of the Eucla Project). First partial surrender report for the period 12/6/2003 to 14/7/2009.
An area located approximately 160 km south-west of Coober Pedy and just to the west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Tallaringa South (part of the Eucla Project). First partial surrender report for the period 15/8/2005 to 14/8/2009.
An area located approximately 150 km north-west of Tarcoola and 30-45 km south-west of the Challenger gold mine is being explored for possible economic sedimentary uranium mineralisation which is inferred to be present in buried Tertiary...-
Document
-
Mount Christie Siding (part of the Eucla Project). First partial surrender report for the period 26/7/2005 to 25/7/2009.
Mt Christie Siding EL 3380 straddles the Transcontinental Railway north of the Great Australian Bight in the far west of South Australia, approximately 140 km west-northwest of Tarcoola. There is an extensive cover of aeolian sand extending throughout...-
Document
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Tallaringa South and Tallaringa North (part of the Eucla Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 15/8/2005 to 14/8/2010.
As part of a regional exploration project targeting possible economic secondary, roll-front style uranium deposits within buried Tertiary sediments of the Anthony Palaeochannel and its several tributaries, two areas located approximately 130-160 km...-
Document
-
Wynbring (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 23/5/2005 to 22/5/2010.
As part of a regional exploration project targeting possible economic buried secondary, roll-front style uranium deposits within Tertiary sediments of the Wynbring Palaeochannel and its several tributaries, an area located approximately 75 km...-
Document