RB 77/00108 Water well survey, portion of Hd Adelaide.
A water well survey of the eastern portion of the Hundred of Adelaide was carried out and 320 water wells were visited. The groundwater is obtained predominantly from fractured hard rocks, and consequently there is a large variation in well yields and...-
Document
Published: 01 Jan 1977
-
RB 78/00146 Hundred of Inkerman water well survey.
Survey of 11 private water wells.-
Document
Published: 01 Jan 1978
-
RB 76/00050 Water well survey MURLOOCOPPIE 1:250 000 sheet.
A hydrological survey to update information for the MURLOOCOPPIE 1:250 000 geological sheet was carried out in October and November 1975. Approximately 80 water wells were located and photographed. Nearly all wells are used for stock water. Salinity...-
Document
Published: 06 Apr 1976
-
RB 81/00054 Computer simulation of proposed well discharge effects in the Great Artesian Basin.
The effects of pumping from the main aquifer for 20 years at 900 L/sec from hypothetical well 125 km north of Marree, have been simulated using the GABHYD computer program of the BMR. Results indicate that effects outside SA will be minimal and that...-
Document
Published: 01 Jan 1981
-
RB 82/00007 Yacca Road water well completion report.
Successful production well was completed to 104.5 metres into Port Willunga limestones. The water is too saline for lawn grass and requires some dilution.-
Document
Published: 01 Jan 1982
-
RB 77/00002 Resistivity survey, Wardang Island, July 1976.
Resistivity investigations were carried out on Wardang Island in an attempt to determine drilling sites favourable for fresh underground water. The thickness of the Bridgewater Formation (aeolianite) and basement elevations were mapped and contoured....-
Document
Published: 01 Jan 1976
-
RB 77/00021 Disposal of effluent at Kraft cheese factory, Mil Lel, Mount Gambier. Progress report no. 1 to June 1976.
A monitoring programme has been established, in a paddock immediately north of the factory, to ascertain the effect of sprinkler disposal of partly treated factory effluent on soil, herbage and groundwater.composition. The aim of the investigation is...-
Document
Published: 01 Jan 1977
-
RB 77/00022 Underground water in the Booborowie Valley.
A study has been carried out to determine the cause of declining water levels in wells for irrigation, stock and domestic supplies. The study commenced in 19/1 and has involved field surveys, the establishment of a network of observation wells and the...-
Document
Published: 01 Jan 1977
-
RB 77/00017 Report on water well survey, Hd Light.
There is no abstract created for this record-
Document
Published: 01 Jan 1977
-
RB 77/00095 Murray Bridge abattoir pollution assessment final report.
Murray Bridge Abattoir's effluent is being disposed through drainage wells into unconfined aquifers which are hydraulically connected to the Murray River. Six rotary wells encircling the abattoirs area, proved the regional hydraulic gradient to be...-
Document
Published: 01 Jan 1977
-
RB 77/00138 Drainage wells in the Murray Bridge area.
A survey of drainage wells has shown that most are being used to dispose of street runoff and parkland drainage. Silt traps currently in use are poorly designed and not adequately maintained. Best drainage occurs on the northern side of the town where...-
Document
Published: 01 Jan 1977
-
RB 77/00137 Resistivity survey for groundwater, Para Wurlie Basin, Yorke Peninsula.
35 vertical electrical soundings were conducted to outline and define parameters of the freshwater basin situated 20 km west of Warooka on southern Yorke Peninsula. The basin is thought to extend beyond the surveyed area in the south but most of the...-
Document
Published: 31 Dec 1983
-
RB 78/00040 Water well survey, Hundred of Nangkita.
Survey of 122 water wells. Most of the water is obtained from Permian fluvioglacial sands and from hard rocks of the Cambrian Kanmantoo Group.-
Document
Published: 01 Jan 1978
-
RB 78/00039 Groundwater supply, North Haven Golf Course.
Production water well was drilled to 144.5 metres.-
Document
Published: 01 Jan 1978
-
RB 78/00134 Finniss town water supply investigation.
Well (100 metres) intersected 6 thin low yielding aquifers mostly in Tertiary and Permian sands.-
Document
Published: 01 Jan 1978
-
RB 80/00080 Burra mine - Regional effects of dewatering. Progress report no. 1.
Dewatering began in 1975 and 10 000 kl/day is being pumped, to be increased to 16 000 kl/day until the cessation of mining in 1981. Although dewatering has caused a water level decline of several metres within 3 km of the mine, yields are still...-
Document
Published: 01 Jul 1980
-
RB 80/00136 Hazelwood Park Recreation Reserve, hydrogeological investigation. Bore completion report.
A bore (total depth 194 metres), intersected 85 metres of Recent and Quaternary clay and sandy clay, above 109 metres of Tertiary fine quartz sands. Adelaidean bedrock was not intersected. It was completed as an irrigation well with a screen from...-
Document
Published: 01 Jan 1980
-
RB 82/00012 Hydrogeochemical study of groundwater in South Australia and its application to mineral exploration.
State wide sampling programme has indicated that hydrogeochemical methods are a useful prospecting tool for polymetallic sulphide mineralization. The groundwater generally has assemblage of anomalous heavy metal content near known mineral deposits....-
Document
Published: 01 Jan 1982
-
RB 82/00013 Sampling, testing and classification of Adelaide loam.
In Adelaide, the term loam' is applied indiscriminately to variety of soils for use in gardens irrespective of texture or suitability. Most of the loam is obtained from fluvial sediments of the Gawler River. The Mining Act has no power to control loam...-
Document
Published: 01 Jan 1982
-
RB 79/00017 Completion report irrigation well for D.J. and N.P. Mount, secn 11 Hd Kingsford, Co. Chandos.
The well has been drilled into an area of low salinity groundwater occurring within the Tertiary limestone aquifer at Karte, north-west of Pinnaroo. A 48-hour well test was carried out at an average pumping rate of 2600 m3/day (23,800 gals/hr), and...-
Document
Published: 01 Jan 1979