-
Paralana Hill (part of the Poontana Uranium Joint Venture Project). Progress reports to licence expiry/renewal, for the period 19/12/1979 to 8/2/1983.
Targets of ongoing subsurface investigations in the plains area north-west of Lake Frome, now being conducted under a new joint venture, were respectively to delineate further sedimentary uranium occurrences within buried Middle and Late Tertiary...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-54, north Benagerie Dome copper-gold mineral prospects. Project interim and final reports.
In early 2005 Havilah Resources applied for and was successful in gaining PACE Initiative funding for part of the cost of certain exploration drilling on its Benagerie Dome acreage, to carry out a programme with these aims: 1). To confirm, better...-
Document
-
Data release - as updated : Lake Frome South. Annual reports to licence expiry/full surrender, for the period 9/5/2005 to 25/11/2015.
A large area centred ~110 km north-northwest of Olary and lying adjacent to the south-eastern margin of Lake Frome has been explored initially for buried sedimentary or calcrete type uranium deposits that may have formed in Pleistocene and Recent...-
Document
Published: 26 Nov 1915
-
Data release [made at SA Director of Mines' discretion] : Old Hut area (part of the Marree Uranium JV Project). First annual report for the period 30/6/2009 to 29/6/2010.
Exploration for possible Beverley - type Tertiary sedimentary uranium deposits associated with the north-western margin of the Mount Babbage Inlier, being undertaken within a small licence area centred approximately 120 km east of Lyndhurst, has...-
Document
Published: 16 Sep 1910
-
Data release : Goulds Dam. Annual reports submitted until the commencement of licence joint reporting with EL 3906 Katchiwilleroo Dam, for the period 18/3/1997 to 26/8/2009.
An area located on the southern edge of the Mesozoic to Tertiary Frome Embayment, 100 km north-west of Olary, which overlies Proterozoic igneous and metamorphic basement of the Curnamona Province, is being explored primarily for possible buried...-
Document
Published: 01 Feb 1911
-
A preliminary assessment of the Four Mile uranium prospect.
In June 2005, Lindsay Curtis was engaged by Quasar Resources and Alliance Development to prepare an expert preliminary report on the prospectivity of the so-called "Beverley 4-Mile" sedimentary uranium mineralisation occurrence, which the joint...-
Document
-
Yarramba. Final report at licence full surrender, for the period 27/8/2009 to 26/8/2014.
No field work was performed on EL 3904 Yarramba during the period August 2009 to August 2011. During Year 5 of EL 3904 ending on 26/8/2012, the following activities occurred: - Fugro Airborne Surveys were contracted by Uranium One to complete an...-
Document
Published: 25 Nov 1914
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Katchiwilleroo Dam. First annual report to 26/6/2003, plus first partial surrender report for the period 27/6/2002 to 26/6/2003.
An area located on the southern margin of the Frome Embayment has been acquired to explore for Tertiary roll-front sedimentary uranium deposits. Within the Frome Embayment this style of mineralisation has been sought since 1969, and the Goulds Dam...-
Document
Published: 15 Sep 1903
-
Data release - as updated : Lake Carnanto (part of the Curnamona Project). Annual reports to licence full surrender, for the period 13/1/2004 to 14/7/2014.
An area located ~140 km north-northeast of Olary has been explored for possible economic buried sedimentary uranium mineralisation hosted by Tertiary palaeochannel sands of the Callabonna Sub-basin. Previous exploration activities had partly defined...-
Document
Published: 07 Mar 1914