-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 80/00054 Coongra no. 1 well completion report.
Aim was 1) to determine whether Permian sediments extended across the northern Muloorina Ridge, and thereby connected the Arckaringa and Pedirka basins; 2) to identify basement high-speed seismic refractor. The well was abandoned in Early Cretaceous...-
Document
Published: 01 May 1980
-
RB 80/00116 Mesozoic stratigraphy of the Frome Embayment.
This study covers a southern lobe of the Eromanga Basin known as the Frome Embayment, which extends W-E from the Flinders Ranges to the Barrier Ranges, and southwards from the vicinity of Moolowatana Station to the Scott Hill-Mundaerno Hill region....-
Document
Published: 01 Feb 1980
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
The Arckaringa Basin Coal Project. Progress reports to licences' respective expiry/full surrender, for the period 12/5/1980 to 2/7/1990.
TARGET: Coal in the Arckaringa Basin. EXPLORATION: Rotary drilling (248 holes totalling 56,498 m, including 59 partly cored holes totalling 3555 m. RESULTS: The Wintinna, East Wintinna, Westfield and Murloocoppie coal deposits were discovered and...-
Document
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Block review, basin analysis and hydrocarbon prospectivity of the Pedirka Block in the Pedirka Sector.
The Purni, Peera Peera and Poolowanna Formations were evaluated in terms of depositional and structural basin analysis using the model of Genetic Increments of strata (GIS). Eight reservoir intervals have been identified and the pertinent reservoir...-
Document
Published: 01 Jan 1986
-
Pedirka Sector: a reassessment of geology, porosity, maturity and maturity history.
A review of the Permo-Triassic and Mesozoic distribution of reservoir units. Data for some Birdsville Track Ridge wells are included as the development of the Pedirka Sector basins and the Birdsville Track Ridge are closely related.-
Document
-
Lyons, Mount Christie, Barton, Immarna and Immarna South. Final report at licences' joint expiry/full surrender, for the period 3/6/1983 to 2/6/1988.
TARGET: Possible diamonds in the Barton region. EXPLORATION: Acquisition of an aerial magnetic-radiometric-VLF EM survey (line spacing: 300 m; altitude: 70 m) led to field investigations of 142 potential kimberlite targets generated from this survey...-
Document
-
Burial history of the eastern Officer Basin, South Australia.
Burial history analysis of the structurally complex eastern Officer Basin region was performed using data from petroleum, trona exploration and stratigraphic wells, seismic upholes, coal drillholes and selected seismic sections, to construct isopachs...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document