-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
RB 89/00031 Palynological analysis of Early Cretaceous sediments east of the Peake and Denison Ranges.
Samples of calcareous concretions, mudstone, siltstone and sandstone were assigned an Aptian age.-
Document
Published: 01 May 1989
-
RB 96/00043 Report on a transient electromagnetic survey around Garford Palaeochannel, SA.
There are no known major groundwater resources in the Garford area, which borders the Barton and Ooldea Ranges dunefield and Great Victoria Desert southwest of Coober Pedy. The groundwater that is used by graziers for stock watering occurs in...-
Document
Published: 01 Sep 1996
-
RB 88/00062 Bopeechee geophysical survey. Operations and processing report.
A combined EM, resistivity and seismic refraction survey was carried out in the Great Artesian Basin near Lake Eyre South between 18.9.86 and 8.10.86. 15 vertical electrical soundings, 12 Sirotem traverses (150 readings) and 7 refraction spreads were...-
Document
Published: 01 Aug 1988
-
RB 88/00060 1987 Curdimurka Seismic Survey operations and processing report.
The survey was carried out by SADME on the SW margin of the Great Artesian Basin near Lake Eyre South. 22.9 line km of explosive cord shot data and 5 lines were recorded, each of 4-fold CDP coverage and 2-fold vertical stack. Seismograph Service Ltd...-
Document
Published: 01 Aug 1988
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
Haggard Hill, Whymlet Well, Bon Bon Outstation, McDouall Peak and Phar Lap Outstation (the Kingoonya Project). Joint annual reports and final report to licences' surrender, for the period 21/6/2006 to 9/4/2010.
Exploration of a 4600 square km project area comprising five licences in two contiguous groups within the Kingoonya region has targeted two distinct styles of uranium mineralisation. The primary focus was on possible sandstone - hosted deposits within...-
Document
Published: 16 Apr 1910
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Warrataddy Hill (part of the ABMINGA Diamond Project and the Tieyon Ni/PGM Project). Annual reports to licence expiry/full surrender, for the period 25/10/1993 to 16/3/2009.
Early work on the subject licence took place after 25/10/1993 as part of a regional search for possible shallowly buried diamondiferous kimberlites, conducted by Caldera Resources and Laura Holdings across a large tenement package which had been...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Commonwealth Hill. Combined first annual and final report to licence expiry/full surrender, for the period 2/1/2007 to 1/1/2008.
An area located approximately 90 km north-west of Tarcoola was reviewed for its potential to harbour possible economic Cu-Au-U-REE mineralisation, Archaean basement structure-related mesothermal/hydrothermal gold, or near surface sedimentary roll...-
Document
Published: 15 Feb 1908
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document