-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Reaphook Hill and Mount Frome (a tenement group having amalgamated expenditure commitments, which is part of the Flinders Ranges Project). Joint annual reports for the period 4/8/2001 to 1/7/2015.
During the third year of exploration nominally ending on 1/7/2002 [and subsequent to the starting date of 5/3/2002 for the application of provisions of the Flinders Ranges Project's multi-tenement Amalgamation of Expenditure Agreement (AEA), whence...-
Document
Published: 07 Aug 1915
-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 1922
-
Corunna. Progress and final reports for the period 22/7/91 to 21/7/92.
TARGET: Broken Hill or Aggeneys - Gamsberg type stratiform base metal deposits within the metamorphosed Palaeoproterozoic Hutchison Group chemical sediments in the Corunna area, possibly hosted by geochemically anomalous carbonate and silicate facies...-
Document
-
Attempted dating of galenas from four drill core samples, Mount Gunson copper deposit. (Appendix 6 to progress report to 19/1/1975).
An extremely tentative age estimate for lead mineralization is 1350 to 920 Ma, with an ore remobilization age (assuming only one such phase) of 920 to 500 Ma.-
Document
Published: 01 Jan 1975
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 2 of 3 ].
In May 1992 six traverses of shallow RAB drilling were completed at the Angas prospect (222 holes for a total penetration of 1550 m). The objective was to test the Cambrian bedrock geochemistry beneath shallow Tertiary and Recent sediments that cover...-
Document
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Aroha. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 26/5/1982.
As part of Esso's continued exploration programme for buried Late Proterozoic stratiform uranium deposits in the Uno - Corunna area, detailed geochemical, petrological, thermoluminescence and lead isotope studies were performed on samples obtained by...-
Document
-
Ediacara. Annual and final reports to licence expiry, for the period 14/7/1992 to 13/7/1997.
Possible Century or Neves-Corvo style stratabound and barite - associated, thinly bedded lead-zinc-copper sulphide/sulphate mineralisation existing in Late Precambrian to Lower Palaeozoic marine sediments of the Adelaide Geosyncline, was the target of...-
Document
Published: 14 Apr 1999
-
Mount Compass (the Finniss River Project). Combined first annual/final report to licence expiry/full surrender, for the period 19/11/1996 to 18/11/1997.
A gossanous bedrock outcrop present within Early Cambrian sediments of the central Fleurieu Peninsula, and situated 16 km north-east of Mount Compass township, was investigated as a possible Mississippi Valley - type (MVT) base metals target....-
Document
-
Ooloo mine area. Annual and final reports to licence expiry/full surrender for the period 24/1/2006 to 23/1/2009.
An area located about 110 km east-southeast of Marree was taken up initially to explore for possible economic silver and base metal mineralisation, but the scope of the search was later broadened to include assessing the prospectivity for primary and...-
Document
Published: 19 Mar 1909
-
Toweroo Bore. Progress reports to licence surrender for the period 30/9/1968 to 30/4/1970.
Uranium exploration, undertaken over a small area of poorly outcropping to shallowly subcropping amphibolite facies metamorphosed Early Precambrian basement located near Toweroo Bore, 35 km north-northwest of Crocker Well, has comprised 144 line km of...-
Document
Published: 04 Feb 1970
-
Ooldea. Progress and final reports to licence expiry/full surrender, for the period 16/11/1972 to 15/11/1973.
In a search for possible economic roll-front sedimentary uranium deposits thought to be hosted by Middle Eocene Pidinga Formation fluvial and lacustrine terrestrial sediments deposited in the eastern Eucla Basin, 13 scout RAB/RC open holes were...-
Document
-
Hiltaba. Progress and final reports for the period 22/6/1972 to 21/6/1973.
Rock chip and stream sediment samples were analysed for U, Th and base metals. In addition, water samples from bores were analysed for U. All assays were low. It was concluded that the Hiltaba Granite has slightly elevated but insignificant levels...-
Document
Published: 17 Oct 1973