-
Yudnamutana. Progress reports to licence expiry/renewal, for the period 24/6/1972 to 23/6/1973.
As part of continuing exploration for possible economic buried stratiform / hydrothermal copper mineralisation in the Yudnamutana Mining Field, the target lower Callanna Group strata were geologically mapped, petrologically studied and geochemically...-
Document
-
Moonta-Wallaroo region - South Australian Exploration Initiative. Prospectivity re-assessment and GIS data package (compiled 1994-1995).
To promote renewed regional exploration of the northern Yorke Peninsula using modern techniques and concepts, MESA as part of the SAEI programme has prepared a GIS-based data package, which incorporates a study of all available drillcore and a...-
Document
-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 45/00092 Report of overseas visits April 1956 - September 1956.
There is no abstract created for this record-
Document
Published: 01 Jan 1957
-
RB 85/00030 p: 203-212;Lib 1 Tectonics development and metallogeny of the Kanmantoo Trough in South Australia.
The Kanmantoo Trough is the sedimentary and tectonic link between the Adelaide Geosyncline, and volcano - sedimentary sequences of the Tasman Fold Belt. Cambrian Flyschoid sediments were likely deposited on a marginal shelf, reflecting tectonic...-
Document
Published: 01 Sep 1985
-
RB 76/00122 Geology of the Kitticoola mine (with appendix on Palmer granite).
37 000 tonnes of gold-copper ore have been produced from the Kitticoola Mine in five phases of mining during its 150 year history. 30 000 tonnes were mined as gold ore, yielding 162 560 grams of gold at an average grade of 5.4 grams/tonne. 7 000...-
Document
Published: 01 Jan 1979
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document