-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
RB 60/00082 Coober Pedy Opalfield.
Mapping of the Coober Pedy Opalfield has shown that opal occurrence, although erratic, is not entirely unpredictable. Several groups of workings are present in an area of about 150 square miles. The host rock is a distinctive pink and white...-
Document
Published: 30 Apr 1965
-
RB 96/00032 Mount Barker Creek 1. Well completion report.
Mount Barker Creek 1 was drilled by MESA Mineral Provinces Branch at a location 30 km southeast of Adelaide during May 1994 to test a model of stratiform lead-zinc mineralisation within the Kanmantoo Trough, and to confirm the composition and...-
Document
Published: 01 Oct 1996
-
Three Creeks area (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 5/6/2006 to 4/6/2010.
The Three Creeks EL 3567 covers, for the most part, the north-westerly plunging Yednalue Syncline. Lying to the south-east of the Worumba Anticline (a diapiric structure cored by disrupted Callanna Group), the syncline comprises Umberatana Group...-
Document
Published: 17 Sep 1910
-
Prospect Hill. Progress reports and annual reports to licence expiry/renewal, for the period 23/11/1990 to 22/11/1994.
Continued evaluation of possible economic primary tin oxide mineralisation in the Prospect Hill area, 20 km north-west of Moolawatana Homestead, concentrated on infill channel geochemical sampling and mineragraphic/petrogenetic sampling of costeans...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Hawker. Final report at licence expiry/full surrender for the period 2/7/2007 to 1/7/2009.
Copper Range has targeted several different styles of base metal mineralisation within the Chace Range district. Initially its focus was on sediment (sandstone)- hosted copper deposits, with exploration being confined to reconnaissance field visits to...-
Document
Published: 22 Jun 1909
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Hawker. First partial surrender report for the period 2/7/2007 to 1/7/2008.
Exploration of the outcropping Proterozoic/Cambrian stratigraphic boundary in the Chace Range region of the southern Flinders Ranges, in one licence subarea taken out close to Hawker and another a short distance to the north-east, targeted possible...-
Document
Published: 18 Dec 1908
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915