-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document
-
Nilpinna Springs. [Farminee's diamond exploration] Progress report for the period 13/7/1986 to 12/1/1987.
TARGET: Diamondiferous kimberlites in the Boorthanna Trough region (near Nilpinna Springs). EXPLORATION: A literature review, the reprocessing and re-interpretation of data from BHP's 1983 Peake Creek Aerial Magnetic Survey flown by Aerodata /...-
Document
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
Millers Creek. Progress reports to licence full surrender, for the period 25/7/1989 to 29/7/1993.
Exploration for diamonds in the Millers Creek area, 150 km south-east of Coober Pedy, comprised an airborne magnetic and radiometric survey followed by ground magnetic surveys over aeromagnetic anomalies interpreted to represent potential kimberlites....-
Document
Published: 05 Sep 1993
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
PEL 31, southwestern Eromanga Basin. Progress and final reports for the period 30/9/85 to 30/9/88.
TARGET:Primary target was migrating oil trapped in Algebuckina Sandstone at sites along the Cooryaninna Anticline.EXPLORATION: - Landsat survey, - reconnaissance seismic survey (Curdimurka - Marree Seismic Survey) over the Marree Block in 1985, - soil...-
Document
Published: 01 Jan 1988
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
Warrataddy Hill and Mount Anthony (part of the Abminga Project). Joint first partial surrender report, for the period 17/7/2006 to 16/7/2009.
The Abminga Project originally consisted of five exploration licences, ELs 3575, 3599, 3600, 3601 and 3602, all held 100% by Maximus Resources. ELs 3575, 3599 and 3600 were surrendered on 2/4/2009 [see Env 11884]. Under a joint venture made with...-
Document