-
Emu Dam (formerly Billeroo West). Data release in lieu of partial relinquishment upon licence renewal (as EL 2878) : annual reports for the period 4/11/1996 to 3/11/2001.
Exploration for possible economic Early Proterozoic stratabound Pb-Zn-Ag deposits of Broken Hill type, and for Olympic Dam style, Middle Proterozoic Benagerie Ridge volcanogenic sediment - hosted, epithermal / hydrothermal Cu-Au-Mo(-U) occurrences of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-34, Drew Hill JV area Curnamona Group base metal mineral prospects. Project final report.
During early 2005, the Drew Hill joint venture partners conducted a regional base metal exploration programme over their mineral tenements located approximately 20-70 km north-east of Olary. Possible epithermal iron oxide copper-gold (IOCG)...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-18, Super Nova IOCG mineral prospect. Project interim and final reports.
This PACE-subsidised drilling project aimed to discover a new copper-gold mineralised Iron Oxide Copper Gold (IOCG) magmatic centre, similar to that which forms the setting of the Olympic Dam deposit, but lying within the northern margin of the...-
Document
Published: 01 Dec 1905
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-54, Bonython Hill mineral prospect. Project interim and final reports.
EL 2788 (Bonython Hill) covers 120 square km of the Broken Hill Domain, and is regarded as being prospective for Broken Hill - type (BHT) lead-zinc-silver mineralisation and for iron oxide - associated copper-gold (IOCG) deposits. As one of its PACE...-
Document
-
Iron Baron (part of Roopena Joint Venture Project). Annual reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Exploration for possible buried iron oxide-associated copper-gold deposits along the eastern side of the Middleback Range in the vicinity of Iron Knob, has consisted of a review of historical calcrete sampling data and the acquisition and processing...-
Document
Published: 04 Nov 1908
-
Mabel Creek. First partial relinquishment report at licence expiry/renewal, for the period 20/12/1999 to 19/12/2003.
The northern part of an area located approximately 80 km north-west of Coober Pedy was compulsorily relinquished on 19/12/2003 at licence renewal, due to its perceived low prospectivity. Exploration of the underlying Palaeoproterozoic /...-
Document
Published: 16 Mar 1905
-
Ben Lomond (part of Perilya's Flinders Ranges Project). Annual reports and final report to licence surrender for the period 2/3/2000 to 17/11/2007.
Due to the licensee's competing commitments from others of its tenements in the exploration project area, the planned evaluation of geochemical prospects and Landsat Fe-alteration anomalies detected in shelf margin, deep-water carbonate sedimentary...-
Document
Published: 22 Jan 1908
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-04, Ceduna Mafic Intrusive Complex base metal sulphide mineral prospects. Project interim and final reports.
Mithril Resources have used a grant of PACE Initiative Year 2 funds to perform additional drilling on their EL 3105 located just north of Fowlers Bay. This area is regarded as being very prospective for Mid-Proterozoic mafic/ultramafic - hosted...-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
Doubtful Bore. Annual reports to licence expiry/full surrender for the period 1/5/2006 to 30/4/2008.
A small licence area located about 50 km north-northwest of Tarcoola has been explored by Minotaur for possible IOCG style mineralisation buried under extensive aeolian sand cover, by conducting regional and infill gravity surveys over their larger...-
Document
Published: 08 Aug 1908
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Lilydale. First annual report and final report to licence full surrender, for the period 10/3/2004 to 6/7/2005.
Exploration for possible concealed porphyry style Cu-Au deposits of a kind similar to the nearby Blue Rose prospect surface skarn occurrence was undertaken over an area of the eastern Nackara Arc, 50 km south-east of Yunta. Work comprised inspection...-
Document
Published: 06 Jul 1905
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 1903
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-06, Mingary area stratiform, Broken Hill type base metal mineral prospects. Project final report.
Historic drilling undertaken on the NSW side of the state border with SA, adjacent to EL 2820, has encountered quartz-gahnite, meta-iron formation and meta-amphibolite rock types that have been correlated with the highly base metal - prospective...-
Document
-
Lake Yalkalpo. Annual and final reports to licence expiry for the period 29/9/1998 to 3/3/2005.
Exploration for possible buried epithermal/hydrothermal iron oxide - associated copper-gold deposits, in an area of inferred shallow Proterozoic basement centred on Lake Yalkalpo, has sought to identify gravity anomalies similar to those seen...-
Document
Published: 23 Mar 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
Trumpeter (part of the Mount Woods Joint Venture Project). Annual and final reports to licence surrender for the period 19/12/2000 to 29/11/2007.
Ground covering a major east-west trending shear zone in the north-eastern portion of the Mount Woods Inlier was taken up by Goldstream Mining to allow an evaluation of its IOCG - style mineralisation potential, possibly for Fe-Cu-Au occurrences of a...-
Document
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document