-
RB 79/00092 Petrophysical data on Wilkinson stratigraphic drillhole no. 1.
Various petrophysical property measurements (total count radiometric, mag susceptibility and specific gravity) were made at 1-metre intervals on samples of stored drill core recovered from the hole depth range 210 m to 710 m (TD) in SADME Wilkinson 1...-
Document
Published: 01 Jul 1983
-
Kyancutta. Annual reports and final report to licence expiry/full surrender, for the period 16/4/2014 to expiry 15/4/2018.
An area extending for 26 km to the south and south-east of Wudinna was taken up by Minotaur to evaluate the economic potential of known but poorly defined occurrences of the industrial minerals gypsum and alunite that are associated with Recent salt...-
Document
-
RB 67/00085 Minlaton stratigraphic no. 2 borehole, Yorke Peninsula. Drilling completion report.
This borehole was drilled to a total depth of 321 ft. 4 ins., and a complete cored section was obtained of the lower part of the Middle Cambrian Ramsay Limestone and of the Lower Cambrian Red Bed Clastics, in which thin bands of gypsum had been...-
Document
Published: 07 Nov 1968
-
Callanna and Marree areas (Marree West Project). Combined first annual/final report to licences' expiry/full surrender for the period 22/10/2007 to 21/10/2008.
Exploration for possible economic buried sedimentary uranium mineralisation, thought to be associated with an interpreted palaeodrainage EM anomaly originating within Mesozoic or Tertiary strata in two areas near Marree, addressed the potential for...-
Document
-
Yaninee. Annual report and final report to licence expiry/full surrender, for the period 16/1/2014 to 15/1/2016.
An area extending for 40 km to the west and south of Wudinna was taken up by Minotaur to evaluate the economic potential of known but poorly defined occurrences of the industrial minerals gypsum and alunite. The company's office-based compilation and...-
Document
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Island Lagoon. First partial surrender report at licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Tapley Hill Formation - hosted, Zambian Copperbelt style stratabound copper was targeted in an exploration programme which consisted of ground magnetic surveying and stratigraphic percussion drilling and geophysical logging (10 holes for 2058 m total...-
Document
-
Andamooka. Progress and final reports to licence surrender for the period 26/11/1970 to 25/5/1972.
An area situated adjacent to the recently defined Andamooka Opalfield, and located about 20 miles north of Andamooka township centre, has been explored for possible economic occurrences of opal or base metals within Cretaceous and Precambrian strata...-
Document
Published: 07 Jan 1972
-
Lake Frome. Progress reports for the period 23/9/1975 to 22/9/1977.
Rotary drilling of 23 open holes (total 4 817 m) in a search for Tertiary sedimentary uranium occurrences north-west of Lake Frome intersected an aureole of radioactivity greater than ten to fifteen times background level in eight of the holes.-
Document
Published: 11 Oct 1977
-
Mount McCallum [formerly Wertaloona]. Progress reports to licence expiry/renewal, for the period 28/7/1975 to 27/7/1977.
In the search for possible economic sedimentary uranium lately centred on buried Tertiary palaeochannels in the vicinity of Munyallina Creek, where earlier good drilling indications of roll-front uranium mineralisation had been detected, licence...-
Document
Published: 11 Oct 1977
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-11, Lake Blanche region Quaternary palaeochannel / palaeolake margin calcrete - hosted or roll-front style uranium mineral prospects. Project final report.
Approved PACE project DPY2-11 was an attempt to find calcrete or roll-front type sedimentary uranium mineralisation in Quaternary fluvial channels that drain the northern and eastern margins of the uranium-enriched Mount Painter and Mount Babbage...-
Document
Published: 20 Sep 2006
-
Waukaringa. First annual and final report for the period 18/11/99 to 17/11/2000.
The presence of historic hard rock and alluvial goldfields in the Waukaringa - Lovely's Gully area, 35 km north of Yunta, prompted acquisition of the licence to explore the gold and other metal potential of surficial and deeper, altered cover...-
Document
Published: 30 Mar 2001
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 2016
-
RB 2003/00013 North-western Murray Basin geological synthesis, South Australia.
The Murray Basin is an intracratonic basin filled with Cainozoic fluvial to shallow marine sediments. Deposition in the Eocene and early Oligocene was characterised by floodplain and swamp deposits, emplaced with occasional interbeds of shelly clays...-
Document
Published: 01 Aug 2003
-
ExpNotes MARREE: Explanatory Notes MARREE, SH 54-05.
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document