The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 1915
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Old Wartaka. Annual reports for the period 8/5/2013 to 7/5/2019.
A small area located on the eastern side of the Roopena Fault Zone, proximal to the south-eastern margin of the Gawler Ranges, is being explored for possible buried epigenetic gold and silver mineralisation, or IOCG type base metal sulphide...-
Document
Published: 13 May 1919
-
Uno Range (part of the East Eyre Peninsula Project). First partial surrender report, for the period 1/8/2011 to 31/7/2018.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 05 Oct 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Data release (in part made in lieu of submitting a second partial surrender report) : Uno Range (part of the East Eyre Peninsula Project). Annual reports for the period 1/8/2011 to 31/7/2020.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 18 Dec 1920
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Morgans (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 17/1/2012 to 16/1/2019.
37 square km or ~38% of the formerly once-reduced area of EL 4828/5933 Morgans have lately been relinquished, this block of ground covering a section of the licence located along the north-western shoreline of Lake Gilles. It has been explored mainly...-
Document
-
Mount Miccollo (part of the Wilcherry Project). Second and third partial surrender report, for the period 10/6/2011 to 27/5/2021.
An area centred ~100 km west of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now relinquished...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Morgans (part of the East Eyre Peninsula Project). Annual reports for the period 17/1/2012 to 16/1/2019.
An area of mainly covered bedrock consisting of two separate sub-blocks bordering the south-eastern Gawler Ranges, which is considered prospective for finding buried hypogene IOCG mineralisation and possible stratiform and metamorphic base metals in a...-
Document
Published: 21 Mar 1918
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-12 - Corunna Station, north-eastern Eyre Peninsula, structurally controlled Mesoproterozoic epithermal Ag-Au and base metal prospects. Drilling final report.
Musgrave Minerals Ltd (MGV) is the holder of the subject EL 5497 Corunna North, located in the southern Gawler Ranges approximately 65 km west of Port Augusta and 10 km north of Iron Knob, where it is exploring for economic base and precious metal...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Nyllow Hill (near Tumby Bay). Progress and final reports for the period 2/9/88 to 1/9/90.
TARGET: Precious metals, specifically platinum group metals and gold, associated with ultrabasic intrusives and strongly faulted and altered metasediments in the Tumby Bay area. EXPLORATION: Geochemical sampling including rock chip, gravel and BCL...-
Document
-
Nyllow Hill. First partial surrender report for the period 2/9/1988 to 1/9/1989.
The licence was taken out to assess the untested potential for finding platinum group metal occurrences associated with two known ultramafic intrusive plugs outcropping in the Lincoln Uplands, 40 km north-northeast of Port Lincoln. Incidental...-
Document
-
Tumby Bay and Butler. Progress and final reports to licence surrender for the period 15/7/91 to 30/5/93.
Exploration for gold in the banded iron formations of the Hutchison Group, conducted in the Tumby Bay area and west of Arno Bay on Eyre Peninsula, comprised a regional BLEG stream geochemical survey and follow-up stream, soil and rock chip sampling....-
Document