-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 1919
-
Narlaby. Combined first annual report / final report to licence full surrender, for the period 6/1/2017 to 8/3/2018.
An area centred ~90 km north-east of Streaky Bay was taken under licence to explore for possible economic underground concentrations of dissolved potassium, lithium, boron and magnesium which may have become ponded within stagnant groundwater lenses...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Camel Lake. Annual reports to licence surrender for the period 16/11/2012 to 15/11/2023.
An area located ~ 70 km north-east of Ooldea Siding and 50 km east of Maralinga is being explored for the industrial mineral kaolin, and more particularly its crystallographic form halloysite, which typically occurs as microtubules or nanotubes which...-
Document
Published: 21 Nov 1923
-
Pidinga Lakes. Progress reports to licence expiry/full surrender, for the period 18/12/1969 to 17/12/1970.
Shallow drilling of sediments on the eastern margin of the Eucla Basin (in 25 vertical rotary mud holes with a total penetration of ~1280 m) to test for secondary uranium mineralisation, although limited by drilling difficulties, has resulted in the...-
Document
Published: 26 Feb 1971
-
Mount Sturt. Progress reports to licence expiry/full surrender, for the period 20/2/1980 to 19/11/1980.
As part of continuing regional exploration for possible economic concealed sedimentary uranium deposits in an area extending east and north of Minnipa, open hole rotary drilling of 44 holes (total 2564 m) along seven traverses located adjacent to the...-
Document
-
Dunn Hill. Progress reports and final report to licence full surrender, for the period 19/2/1985 to 18/5/1988.
TARGET: Sedimentary uranium in the Tertiary Narlaby Palaeochannel, 30 km east of Ceduna; and regolith kaolinite formed from weathered Proterozoic basement granite. EXPLORATION: A thermoluminescence study of sediments in the most prospective portion...-
Document
-
Pidinga Lakes. Progress reports to licence expiry/full surrender, for the period 18/12/1969 to 17/12/1970.
Shallow drilling of sediments on the eastern margin of the Eucla Basin (in 7 vertical rotary mud holes with a total penetration of ~110 m) to test for secondary uranium mineralisation, although limited by drilling difficulties, has resulted in the...-
Document
Published: 05 Jan 1971
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 1923
-
Yaninee. Progress reports to licence expiry/renewal, for the period 17/3/1980 to 16/3/1982.
Exploration for possible buried sedimentary uranium deposits in Tertiary sediments underlying an area located approximately 100 km east-southeast of Streaky Bay has consisted of the drilling and wireline logging of 114 reconnaissance rotary mud holes...-
Document
Published: 16 Dec 1980
-
Nunjikompita. Progress reports for the period 20/5/1980 to 19/11/1980.
As part of a regional search for sandstone-type sedimentary uranium deposits, Carpentaria drilled 85 rotary open holes (total 4672 m) in an area 60 km east-southeast of Ceduna, and successfully located the south-western extension of the Narlaby...-
Document
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Garford Homestead. Progress and final reports to licence expiry for the period 12/4/1983 to 11/4/1984.
After a regional review of the absorbent clay mineral potential of known palygorskite and attapulgite - bearing Middle Tertiary palaeochannel sediments in an area centred 110 km south-west of Coober Pedy, a possibly economic partly-exposed attapulgite...-
Document
Published: 21 Jun 1984
-
Poondana Rock (part of the Narlaby Palaeochannel Project). Progress reports to licence expiry/full surrender, for the period 25/10/1979 to 24/10/1981.
As part of a continuing search for possible buried sedimentary uranium deposits in the northern Eyre Peninsula region, reconnaissance rotary drilling of 130 holes totalling 6064 m has intersected strata comprising a part of the major Tertiary age...-
Document
-
Ilkina Hill. Progress reports to licence expiry/renewal, for the period 8/1/1979 to 7/1/1981.
Drilling of 70 holes (4441 metres) located substantial Tertiary drainage system in excess of 8 km wide in search for sedimentary uranium. Further drilling recommended.-
Document
Published: 01 Jan 1981
-
Data release [made at SA Director of Mines' discretion] : Eucla Basin Project tenement Group 1. Joint annual reports, for the period 1/1/2016 to 31/12/2018. Plus EL 6369 surrender.
27 contiguous licence areas within the eastern Eucla Basin, that span a combined 21,772 square km of ground between points as far as 90 km north of the Trans Australian Railway, 50 km east of Nullarbor and extending right down to the coastline, and...-
Document
Published: 28 Feb 1919
-
Wirrulla, Cungena, Mortana, Kolballa and Calca. Joint progress reports and joint final report to licences' joint full surrender, for the period 18/8/1989 to 17/12/1991.
TARGET: Possible heavy mineral sands emplaced within Tertiary sediments in the Wirulla, Poochera, Inkster and Streaky Bay areas. EXPLORATION: Reconnaissance 10-15 km spaced and infill 100 m spaced reverse circulation drilling to pre-Tertiary basement...-
Document
-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Venus Bay. Progress reports and final report to licence full surrender, for the period 9/1/1991 to 9/7/1992.
TARGET: Diamonds in 3 areas, one west of Lock, another east of Elliston, and the third surrounding Venus Bay. EXPLORATION: Heavy mineral sampling, airborne magnetic and multichannel radiometric surveys, ground magnetic surveys, and selected anomaly...-
Document