RB 2003/00009 Northern Murray Basin drilling and interpretations, 2001.
Stratigraphic drilling has been undertaken by PIRSA in the South Australian portion of the northern Murray Basin to investigate the stratigraphy and sedimentology of the Cainozoic sedimentary sequences, as well as the heavy mineral sand potential of...-
Document
Published: 01 Aug 2003
-
RB 2000/00038 Qualco Sunlands groundwater control scheme - Stage 1: Aquifer testing for inter-aquifer leakage.
Aquifer testing at two sites in the Qualco Sunlands Irrigation Area showed there is no detectable leakage between the Loxton Sands perched aquifer and the underlying Murray Group Limestone aquifer, provided that representative readings were obtained...-
Document
Published: 01 Sep 2000
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000
-
Pinnaroo, Mount Timothy and Dingo Range (the Pinnaroo Project). Annual reports and final report to licence expiry/full surrender, for the period 19/6/1997 to 18/6/1999.
An airborne magnetic survey acquired by the grant licensee over the Lameroo district during August 1997 generated a number of shallow-source anomalies which suggested that there was fair potential for discovering buried Tertiary palaeocoastal...-
Document
Published: 31 Aug 1999
-
Oakbank - Quondong Vale and Oakvale (part of the Oakvale Project). Joint second partial surrender report, for the period 3/12/1997 to 22/2/2001.
Exploration for possible buried Tertiary heavy mineral sands occurrences consisted of an interpretation of remote sensing data, followed by the conduct of two reverse circulation aircore drilling programmes (28 holes, total 892.5 m). The first...-
Document
-
Balah (part of the Oakvale Project). Final report at licence full surrender, for the period 3/12/1997 to 23/7/1999.
25 vertical open RC/aircore holes (total penetration 1077 m) were drilled during heavy mineral sands exploration of an area stretching from 10 km to 100 km north-northeast of Morgan. The target Pliocene Loxton-Parilla Sand was found to be barren of...-
Document
-
Walker Flat [part of the Mannum - Lameroo Project]. Annual reports plus final report to licence full surrender, for the period 12/11/1998 to 22/12/2000.
Heavy mineral-bearing palaeoshorelines of the Tertiary western Murray Basin were demonstrated to lie within the area of EL 2564 and the adjacent EL 2542. However, work undertaken previously elsewhere in the region suggests that these particular...-
Document
-
Zadows Hill [part of the Mannum - Lameroo Project]. Annual reports plus final report to licence full surrender, for the period 26/8/1998 to 22/12/2000.
Heavy mineral-bearing palaeoshorelines of the Tertiary western Murray Basin were demonstrated to lie within the area of EL 2542 and the adjacent EL 2564. However, work undertaken previously elsewhere in the region suggests that these particular...-
Document
-
Geranium. Annual reports plus final report to licence full surrender, for the period 5/3/1997 to 4/4/2001.
Evaluation of known Tertiary sedimentary diatomite occurrences in the central Murray Mallee was carried out by Agricola Mining Pty Ltd on three prospects located near Geranium. Rotary drilling, with variable recovery sections of bottomhole diamond...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document
-
The Mindarie Heavy Mineral Sands Project. Joint and combined annual reports, for the period 19/12/1997 to 31/12/2010.
An assessment of the Late Tertiary Murray Basin shallow marine clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand accumulations has discovered numerous occurrences of economic to sub-economic amounts of heavy minerals...-
Document
Published: 19 Apr 1911
-
Mannum. First partial relinquishment report for the period from 13/11/1978 to 12/5/1979.
Nine rotary mud open holes with a total penetration of 499.3 m were drilled, chip sampled and geophysically logged in a search for Moorlands - type coal in Eocene Renmark Beds to the south-east of Murray Bridge. Although the target horizon was...-
Document
-
Canegrass Lobe. Progress reports to licence expiry/full surrender, for the period 3/3/1975 to 2/3/1976. Includes Palynological laboratory report no. 183/1. Appendix 1 in progress report for the period ended 2/6/1975.
The possibility that economic coal seams may occur in suspected buried Lower Permian sediments occupying the north-western corner of the Canegrass Lobe, where no deep stratigraphic drilling has hitherto been done, was investigated by Minad using...-
Document
-
ExpNotes RENMARK: Explanatory Notes RENMARK
There is no abstract created for this record-
Document