Geology of the Willippa Anticline, central Flinders Ranges.
In the central Flinders Ranges, Neoproterozoic and early Palaeozoic rocks are found outcropping within a series of broad, open, dome and basin-shaped folds. This region contains most of the diapiric structures in the Adelaide Geosyncline, many, but...-
Document
-
Assessment of the resource potential of leases held by Frontier Exploration in the Central Flinders Zone, Adelaide Geosyncline, South Australia.
Report presents a consultant's independent assessment of the petroleum potential and risked prospect status for PEL 41, using data provided by the licensee.-
Document
-
Woomera 1. Geological sample inspection and drilling progress reports, plus well test technical data.
There is no abstract created for this record-
Document
Published: 17 Feb 1981
-
Wirrabara. Progress and final reports to licence expiry for the period 5/9/78 to 4/9/80.
EL 417 Wirrabara was secured by CRA to investigate previously untested aeromagnetic, induced polarisation and resistivity anomalies in the Wirrabara - Charlton area, and a reported kimberlite at Bangor. Work has consisted of: - 3 line km of IP...-
Document
Published: 01 Aug 1980
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
Island Lagoon. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Basal Neoproterozoic Tapley Hill Formation - hosted stratiform copper was targeted primarily in this exploration programme, which consisted of reconnaissance deep percussion drilling (17 holes for a total advance of 4167 m) on the centres of...-
Document
-
Copley and Leigh Creek. Progress reports for the period 4/10/1982 to 27/1/1991.
TARGET: Exploration and evaluation of known secondary copper occurrences and exploration for gold and phosphates in the Lyndhurst-Copley region. EXPLORATION: Including the work done previously in EL 929, exploration activities undertaken since 1981...-
Document
Published: 01 Jan 1991
-
Granville - Oladdie area. Progress reports and final report to licence expiry/full surrender, for the period 16/4/1970 to 15/4/1971.
Continuing investigation of the stratabound copper and manganese potential of the Granville district consisted of stream sediment sampling, ground magnetic traverses over an atypically aligned aeromagnetic anomaly, and shallow percussion drilling of...-
Document
-
Mount Allen. Progress reports and final report to licence expiry/full surrender, for the period 24/3/1976 to 23/3/1978.
Drilling was the major activity undertaken during the current term of tenure of the Mount Allen ground by the Kapunda joint venture. 4 diamond holes for 996.5 m and 5 percussion holes for 636 m were drilled into bedrock, while another 111 rotary...-
Document
-
Progress and final reports 1 to 8, Cultana EL 374, Oct 1977 to Nov 1979.
There is no abstract created for this record-
Document
Published: 01 Jan 1979
-
Tthe Stuart Range Joint Venture Project. Joint progress reports and final report to licences' joint full surrender, for the period 21/4/1980 to 31/3/1981.
When Getty Oil took over management of the Stuart Range Project licences, it reviewed all of Newmont's drillhole data and undertook reclogging of the drill cores with the aim of correlating stratigraphy across the project area. Starting in October...-
Document
-
Cultana. Progress reports to licence expiry/renewal, for the period 28/10/1975 to 27/10/1977.
Exploration for possible stratiform or hydrothermal/epithermal base and precious metals within Adelaidean metasedimentary cover and Middle Proterozoic crystalline basement in the Cultana area, 35 km south-southwest of Port Augusta, has consisted of...-
Document
-
Beddome Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area centred approximately 90 km north-west of Woomera has been explored for possible economic copper mineralisation associated with geophysical anomalies thought to originate within Adelaidean metasedimentary bedrock. After considerable delays and...-
Document
-
Groundwater investigations. Rosmann East and Paltridge North mines near Copley, South Australia. (Appendix 3 to EL 1580, Leigh Creek. Third quarterly report to 27/1/90.).
Existing test results from dewatering wells over the proposed open cut mining pit were reanalysed and a recharge experiment carried out in an area hydraulically separate from the operating pit.-
Document
Published: 01 Jan 1990
-
Tregalana - Sugarloaf Hill area. Progress reports to licence expiry/renewal, for the period 21/6/1976 to 20/6/1978.
Vertical percussion drilling (4 holes totalling 577 m) and diamond drilling (3 holes totalling 538.4 m) undertaken in the Tregalana and Sugarloaf Hill areas of the Stuart Shelf disclosed weak base metal mineralisation (0.05-0.65% Cu spread unevenly...-
Document
-
Progress reports SML 427 and 648, Copley SA. 1970 to 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1972
-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
RB 69/00091 Happy Valley Tunnels Project old outlet tunnel, geological investigation. Progress report no. 1, maintenance stage, Hd Noarlunga - EWS Department.
The Old Happy Valley Tunnel was constructed around 1895. It is about 8000 feet long; fully concrete lined, and 6.5 feet in internal diameter. It has been operating as a free flow tunnel ever since. It is now proposed to operate it as a pressure tunnel...-
Document
Published: 01 Jan 1969
-
RB 73/00083 Groundwater survey, Hundred English, section 467 - V.H. Neal and Sons.
There is no abstract created for this record-
Document
Published: 01 Jan 1973