Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Woomera, Emmie Bluff, Salt Creek, Portulacca Ridge and Red Lake. Progress reports for the period 21/8/1979 to June 1983.
Continuing exploration in the Woomera area has included the acquisition of a ground magnetic and gravity survey over the Buller Dam anomaly, which lies on the western flank of the Acropolis aeromagnetic anomaly, and this work confirmed that the former...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
Late Proterozoic hydrocarbon potential and its association with diapirism in Blinman 2, central Flinders Ranges, SA.
In early 1991, Blinman 2 wildcat drilled through 2031 metres of sediments of the late Adelaidean Umberatana Group on the flank of the Blinman Diapir. Three small methane shows occurred in fracture zones in the Tapley Hill Formation.Two potential...-
Document
-
RB 44/00063 Myponga Dam Project - Geological investigation of the tunnel route on the proposed pipeline from the reservoir.
Detailed geological examination of the area in the vicinity of the proposed tunnel has shown that, provided suitable precautions are taken, there are no geological factors which will prevent the successful construction of a tunnel through the ridge...-
Document
Published: 02 May 1957
-
RB 80/00060 Wilmington water supply. Discharge test on Spring Creek mine shaft.
26 hour test has shown that the discharge of the existing pump is very close to the safe yield of the well. Analysis of the drawdown curve shows that a second production well sited 150 metres from the present well in the same fissure system would...-
Document
Published: 01 Jun 1980
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
RB 92/00061 Soil Air CO2/O2 Project. Progress report 3, Mount Gunson area.
The rationale of utilising soil air carbon dioxide and oxygen measurements as a guide to oxidising sulphide is that sulphide oxidation in the presence of water and oxygen will produce sulphuric acid, which in turn will attack any carbonates present to...-
Document
Published: 01 Oct 1992
-
RB 95/00030 SAEI Triassic Coal Exploration Program. Exploration Licence Application ELA 228/93, Hawker - Quorn area, South Australia.
The results of a data review by MESA in 1992 to assess the prospectivity of the northern Flinders Ranges for concealed Triassic coal highlighted four main areas as having the best potential for a discovery. Following exploration for coal by MESA/ETSA...-
Document
Published: 01 Jun 1996
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
RB 89/00076 Mount Barker Golf Club water well testing.
Competing groundwater use is a problem in the vicinity of the Mount Barker Golf Club grounds, which has been recognized by the parties involved and government since late 1985. A well monitoring network for both water level and salinity was set up and...-
Document
Published: 01 Nov 1989
-
Gulnare. Combined first annual / final report at licence expiry/full surrender for the period 23/1/2008 to 22/1/2009.
Exploration for possible Neoproterozoic sediment-hosted, unconformity related buried uranium deposits within a synclinally-exposed area of reduced Warrina Supergroup siliclastic rocks, 160 km north of Adelaide, followed a concept that such deposits...-
Document
Published: 02 Dec 1908
-
Three Creeks area (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 5/6/2006 to 4/6/2010.
The Three Creeks EL 3567 covers, for the most part, the north-westerly plunging Yednalue Syncline. Lying to the south-east of the Worumba Anticline (a diapiric structure cored by disrupted Callanna Group), the syncline comprises Umberatana Group...-
Document
Published: 17 Sep 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-31 - Bute township area mineral prospect. Project interim and final reports.
The licensee, Peter Forwood, has been involved in mineral exploration at Bute for many years, initially with North Broken Hill Ltd in ELs 248, 420, 577 and 972, and has pursued the exploration of the area through many phases. Two important features...-
Document
-
Bernard Hill and Mount Moseley. Respective first partial surrender reports, for the period 5/9/2002 to 31/7/2003.
ELs 3008 and 3022 form part of the Mount Gunson Project, where the targets are stratiform copper in Adelaidean sediments and Olympic Dam style mineralisation in Proterozoic basement. As a result of a detailed review by a consultant group, several...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Prince Alfred mine. First annual report to licence full surrender and re-issue as part of a larger tenement, for the period 26/10/1996 to 9/4/1998.
Assays of tailings heaps at the Prince Alfred Mine, located 40 km north-east of Carrieton, returned 1-1.5% Cu. Up to 12.7 % Cu was recorded from rock sampling, and elevated Au and anomalous Cu were recorded in calcrete samples. Four areas of...-
Document
Published: 15 Dec 1997
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document