-
RB 86/00043 Creosote investigation. Woods and Forests Department - Mount Gambier.
Groundwater analysis from 17 wells has detected elevated concentrations of Cu,Cr, As and creosote in the unconfined aquifer at the State Mill, resulting from the discharge of contaminated storm water or septic tank effluent. The contaminated...-
Document
Published: 01 Jul 1986
-
RB 84/00084 Kongorong groundwater pollution investigation.
An SA government investigation has been undertaken to determine the extent of groundwater pollution resulting from the waste disposal practices used at the now abandoned Kongorong cheese factory. During the period 1924 to 1971, liquid effluent from...-
Document
Published: 01 Oct 1984
-
RB 78/00041 Naracoorte planning study engineering geology investigations - B. Turner and Associates.
Naracoorte Corporation area straddles two northwesterly trending dune ridges and their corresponding flats. Cemented limestones of the Bridgewater Formation and Gambier Limestone, occasionally mantled by windblown sands, form the two ridges; younger...-
Document
Published: 01 Jan 1978
-
RB 90/00078 South Australia - Exploration Towards 2000. Seminar, Adelaide, 13 December, 1990. Extended abstracts.
A seminar designed to heighten industry interest in South Australia as a place in which to search for minerals and petroleum was organised by the Department of Mines and Energy at the Australian Mineral Foundation on 13 December 1990. A number of data...-
Document
Published: 01 Dec 1990
-
RB 91/00068 Atrazine occurrence in groundwater in the South-East of South Australia. Report on Stage 1 of investigations.
Sampling of groundwater at Keith and Padthaway to investigate the potential for contamination by pesticides and herbicides detected the herbicide atrazine in the shallow unconfined aquifer. Its detection in wells located at some distance from...-
Document
Published: 01 Jun 1991
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 88/00078 Geophysical investigations at Mil Lel.
Earlier investigation of the pollution plume from the Mil-Lel Cheese Factory suggested that it was wide and continuous, extending some 1.7 km. This survey, using basically the same techniques, indicated a much more fragmented plume, with channels of...-
Document
Published: 01 Sep 1988
-
RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992
-
1986 seismic survey, Riddoch, final report.
A formal operator's geophysical interpretation report for this survey was not submitted; instead the operator's interpretive comment and mapping for the Riddoch data is incorporated within the PEL 32 licence Year 2 annual report (Env 08291 R 8)....-
Document
-
1991 marine seismic survey, Otway OH91 (portion), final report.
AIM: The portion of the BHP basin-wide offshore Otway OH91 marine seismic survey that was conducted within EPP 23 sought to detail certain prospects and leads identified from the interpretation of 1990 and earlier data, and included a regional strike...-
Document
-
1990 seismic survey, Hatherleigh, final report.
AIM; The 1990 Hatherleigh Seismic Survey was programmed to obtain modern detailed and regional infill Vibroseis coverage of the Rivoli Trough. The major objective for licence Year 1 was to provide a detailed 1 km grid of dip lines across the...-
Document
-
Penola Seismic Survey. Reports for the period 15/3/88 to 9/12/88.
AIM: This detailed seismic survey of 12 lines totalling 90.2 line km was proposed to define an optimum location on the Katnook Structure at which to locate an appraisal well for further drilling evaluation of the Katnook gas discovery. In addition to...-
Document
Published: 09 Dec 1988
-
1994 Crankshaft Seismic Survey proposal. Reports for the period March 1993 to March 1994.
AIM: In early 1993 a geophysical review of the Crankshaft 1 drilling outcome was performed, using a synthetic seismogram plus wireline log and seismic data to explain the structural invalidity. It appears that what was believed pre-drilling to be a...-
Document
-
1992 Beachport Seismic Survey. Reports for the period February to June 1992.
AIM: To acquire further detailed reflection seismic coverage of the south-west of the licence area to resolve doubts about the currently mapped closures on the following structures: (i) The Woakwine Prospect, a tilted fault block near the intersection...-
Document
-
1991 Saint Clair Detail Seismic Survey. Reports for the period 2/1/91 to December 1991.
AIM: To add detail to several leads identified by the 1990 Saint Clair Seismic Survey, and to provide further regional coverage, particularly in the north-western part of the licence area. The proposed programme of dip and strike lines will address...-
Document
-
1992 seismic survey, Biscuit Flat, final report.
AIM: The Biscuit Flat Seismic Survey was designed to provide detailed infill coverage over the Rendelsham and Biscuit Flat strong leads in order to mature both for drilling, the objective then being to select a drilling location on one of these two...-
Document
-
1991 seismic survey, Mount Bruce, final report.
AIM: To complete a roughly 1 km-spaced, semi-detailed reflection seismic grid across an area of interest in the north of PEL 52, 3 new infill lines totalling 21.4 line km were acquired in the 1991 Mount Bruce Seismic Survey. Together with the...-
Document
-
1993 seismic survey, Mount Elephant, final report.
AIM: The Mount Elephant Seismic Survey was designed to provide additional detailed coverage over a lead in the area around the small township of Rendelsham. Previous seismic data quality across the Woakwine Range in this area had always been poor, so...-
Document
-
1991 seismic survey, Mount Hope, final report.
AIM: The Mount Hope Seismic Survey main objective was to obtain additional detail of, and mature for drilling in 1992, two leads confirmed by the 1990 Hatherleigh Seismic Survey. The Mount Hope lead on the SE flank of the Beachport High required more...-
Document
-
1990 Greenways Seismic Survey proposals. Reports for the period 9/2/90 to 6/3/91.
AIM: To acquire 18 line kms of detail seismic to firm up a drilling prospect, to satisfy the carried-over part of the PEL 38 Year 1 licence work commitment. In actuality this survey was not carried out: instead the licensees elected in April 1991 to...-
Document