-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
RB 94/00019 BARTON Bedrock Drilling Project, 1993.
Between June and December 1993, 184 vertical RC stratigraphic drillholes totalling 10,126.2 m (average hole depth 55 m) were drilled by Mines and Energy South Australia at 2 km spacing along roadsides traversing much of the BARTON 1:250k map sheet...-
Document
Published: 01 Jun 1994
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-63, Mongolata area epithermal gold and base metal mineral prospects. Project final report.
An observed trend between base metals anomalism in soils and previously identified magnetic and gravity anomalies within inferred Adelaidean basement metasediments present within the eastern part of Mongolata EL 3164 provided the impetus for the...-
Document
-
Milang [Homestead]. First partial surrender report for the period 25/8/2005 to 24/8/2006.
Exploration for a range of mineral commodities over relinquished parts of a licence area situated 80 km north-east of Orroroo has mainly targeted the Cainozoic to Mesozoic cover rocks for possible sedimentary gold, uranium, mineral sands and...-
Document
Published: 14 Sep 1906
-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 1909
-
Naarack, Mabel Creek and Wintinna (part of the Arckaringa Basin Project). Respective final reports at licences' joint full surrender, for the period 26/3/2008 to 2/4/2010.
In a search for postulated Tertiary heavy mineral sands marine placer deposits that may have been formed outside of the presently known north-eastern extent of such age sedimentary basins (i.e. along a proto Eucla Basin coastline existing within the...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Chimpering Rock Hole, Yarrana Hill, Moornaba Rock Hole, Euria Well, Koonibba Mission, Lake Tallacootra, Dunn Hill, Wallala Hill, Mount Centre and Nalara. Quarterly and annual progress reports plus technical reports, for the period 25/7/1989 to 24/7/1992.
Hitherto untried exploration for heavy mineral sands on the eastern margin of the Eucla Basin, conducted by the Ceduna Joint Venture partners since 1989 over ten contiguous licence areas in the Ooldea - Barton area centred 150 km north-west of Ceduna,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Wirrulla, Cungena, Mortana, Kolballa and Calca. Joint progress reports and joint final report to licences' joint full surrender, for the period 18/8/1989 to 17/12/1991.
TARGET: Possible heavy mineral sands emplaced within Tertiary sediments in the Wirulla, Poochera, Inkster and Streaky Bay areas. EXPLORATION: Reconnaissance 10-15 km spaced and infill 100 m spaced reverse circulation drilling to pre-Tertiary basement...-
Document
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Angaston. Progress reports and final report to licence expiry/full surrender, for the period 11/12/1981 to 10/12/1984.
As part of a base metal exploration programme looking for possible stratabound or exhalative/hydrothermal deposits in Cambrian metasediments, which was undertaken approximately 75 km north-east of Adelaide, stream sediment sampling along the base of...-
Document
Published: 07 Mar 1985
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 1917