-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
Beltana. Progress reports to licence expiry/renewal for the period 18/12/1967 to 17/12/1969.
An evaluation of the base metal potential of the greater Beltana 'diapiric' complex was undertaken by MIM via field mapping, soil geochemical surveys and limited shallow rotary percussion drilling at historic surface workings on small showings of...-
Document
-
Mount Plantagenet. Progress reports to licence expiry/full surrender, for the period 11/2/1971 to 10/2/1973.
Ongoing exploration for economic epigenetic and syngenetic copper occurrences in the vicinity of the Worumba Diapir, east of Hawker, has concentrated on field mapping, soil and channel sampling and shallow percussion drilling (47 holes for 3755+ feet)...-
Document
Published: 23 May 1972
-
Mount Neville. Progress and final reports to licence expiry/full surrender for the period 17/3/1969 to 16/3/1970.
Inspection of an area showing diapiric and fault disturbance within upper Adelaidean and Lower Cambrian metasediments in the vicinity of Mount Neville sought to find barite deposits of sufficiently high grade and quantity to resemble those of the...-
Document
-
Mount Stuart. Progress and final reports to licence expiry/full surrender for the period 5/1/1984 to 4/1/1987.
Epithermal, fault-related gold and base metals in calcareous Adelaidean metasediments (cf. the Beltana and Aroona zinc-lead deposits), and sedex style base metals of Mount Isa - McArthur River type, or stratiform base metals in black shale units, were...-
Document
-
Source rock maturity study and petroleum geochemistry of the Arrowie Basin.
This section of the study was based on source rock analyses performed on 75 outcrop and shallow drill core samples from 25 localities, plus other new data derived from Cambrian sediments intersected in the deep petroleum exploration wells Moorowie 1,...-
Document
Published: 13 Jan 1986
-
1981 and 1982 seismic surveys, Wertaloona and Christmas Creek-ARR, final report.
Wertaloona Seismic Survey - AIM:The 1981 Wertaloona Seismic Survey programme was designed by the PELs 5 and 6 Arrowie Block partners to provide the first high quality, multifold seismic reflection data in the area of likely preserved thick Cambrian...-
Document
-
Parachilna. Progress reports to licence expiry/renewal for the period 2/4/1970 to 1/4/1971.
Reconnaissance geochemical sampling of the eastern PARACHILNA mapsheet area for sediment-hosted base metal deposits has succeeded in locating several well-defined areas of interest, although approximately two-thirds of the SML area appears to be...-
Document
-
SADME/Amdel Project 1/1/209 : [petrographic] comparison of some Archaean and Proterozoic iron formations in SA. Progress reports 1 to 4, for the period December 1977 to July 1979.
A project to compare Gawler Craton iron formations of unknown age with those of known Archaean age (from geochronology) and with the Proterozoic, Lake Superior - type Middleback Range iron deposits has concentrated on characterising each formation by...-
Document
Published: 30 Jul 1979
-
RI 035 Geology of The Beltana 1:63,360 Map Area
Includes Palaeontological report on Nilpena limestone. Appendix 3 in: Leeson, B.-
Document
-
RB 63/00058 Geology of the Beltana 1:63 360 map area.
Rocks belonging to the upper part of the Adelaide System and the overlying Cambrian, outcrop in the eastern part of the Beltana area in the Nuccaleena Dome, and form the basement underlying the more recent sediments to the west. In the central and...-
Document
Published: 01 Jan 1970
-
Kallioota. Annual reports and final report to licence expiry/full surrender, for the period 5/6/2006 to 4/6/2010.
A north-northwest trending basement high or horst-like structure mapped in the subsurface at Yadlamalka, located about 50 km north of Port Augusta, which was indicated by magnetic and gravity data to lie at a depth of about 200 m to 600 m close to the...-
Document
Published: 01 Sep 1910
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Port Pirie. Progress reports and final report to licence full surrender, for the period 21/8/1979 to 30/6/1982.
Continuing exploration for possible buried Mount Gunson and Olympic Dam type copper deposits, or other stratabound base metal occurrences within shelfal facies of Adelaidean sediments or in the pre-Adelaidean Wandearah Formation Carpentarian age...-
Document
-
SADME/Amdel Project 1/1/219: Geochronology of the Stuart Shelf. Progress reports nos 1-3 for the period 27/9/78 to 24/6/81.
There is no abstract created for this record-
Document
-
Stuart Creek (part of the Lake Torrens Project). Combined first to fourth partial surrenders report at licence expiry/renewal, for the period 26/1/2003 to 1/7/2008.
Limited RAB drilling (in 5 of 8 vertical holes for a total penetration of 611 m) across a DeepLeach II regolith zinc anomaly that straddles the licence boundary of adjoining ELs 3123 and 3140 failed to encounter any mineralisation or elevated downhole...-
Document
-
Mount McCallum, Mount Morris and Mount Roebuck (part of Flinders Ranges Project). Combined first annual report, plus progress and final reports to licences' expiry/full surrender, for the period 23/5/2005 to 22/5/2008.
Neoproterozoic glacial sedimentary units in the intramontane basinal valley located east of Leigh Creek and Copley, which were considered likely to contain possible geologically suitable palaeo-depositional sites for secondary uranium mineralisation...-
Document
Published: 16 Jun 1908
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909
-
Mount Roebuck. Progress and final reports to licence expiry/full surrender for the period 1/11/1973 to 31/10/1974.
An area located approximately 57 km east of Beltana was taken up to explore for possible economic hydrothermal/stratabound, replacement-type base and precious metal deposits in Neoproterozoic Callanna Group diapiric breccias and rafted dolomitic...-
Document