-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 91/00037 Lincoln Dale, Kyimba and Bunora drilling traverses, southwest of Kimba - Well completion report.
Fifteen rotary holes, 13 with bottom-hole core, tested 3 aeromagnetic anomalies for the presence of Hutchison Group, which is prospective for lead-zinc-silver. Low grade meta-sediments and possible acid volcanics of the Hutchison Group were...-
Document
Published: 01 Mar 1991
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Corunna. Progress and final reports for the period 22/7/91 to 21/7/92.
TARGET: Broken Hill or Aggeneys - Gamsberg type stratiform base metal deposits within the metamorphosed Palaeoproterozoic Hutchison Group chemical sediments in the Corunna area, possibly hosted by geochemically anomalous carbonate and silicate facies...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Eyre Peninsula Pb-Zn data package.
Numerous Pb-Zn-Cu-Ag mines and prospects, including the promising Menninnie Dam prospect located 80 km north of Kimba, occur within graphitic, calcareous and psammo-pelitic metasediments of the Palaeoproterozoic (ca 1900-1850 Ma) Hutchison Group on...-
Document
Published: 01 Jan 1991
-
Franklin Harbour. Progress reports and final report to licence expiry/full surrender, for the period 26/2/1972 to 25/2/1973.
As part of an ongoing regional search of the eastern Eyre Peninsula for possible economic stratiform base and precious metal deposits, soil sampling and SP and IP surveys were carried out over previously identified, separate linear lead and zinc...-
Document
-
Bull 037 Geology and Mineral Resources of Southern Eyre Peninsula
A regional geological survey covered 15 standard 1-mile map sheets. Detailed mapping established a 50 000 ft sequence of Archaean sedimentation of gneissose, schistose and granitoid rocks, migmatite, quartzite, dolomite and haematitic quartzite. These...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo (part of the Menninnie Zinc Project). Annual reports for the period 27/7/2009 to 26/7/2012.
An area located adjacent to the southern margin of the Gawler Ranges that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its south-eastern corner lies approximately 12 km north-west of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Data release - as updated : Botenella Gate (part of the East Eyre Peninsula Project). Annual reports to licence expiry/full surrender, for the period 20/4/2009 to 19/4/2018.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. There was also...-
Document
Published: 05 Jun 1918
-
Aroha. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 26/5/1982.
As part of Esso's continued exploration programme for buried Late Proterozoic stratiform uranium deposits in the Uno - Corunna area, detailed geochemical, petrological, thermoluminescence and lead isotope studies were performed on samples obtained by...-
Document
-
Marble Range. Annual reports plus first partial relinquishment report, for the period 30/4/1997 to 16/3/1999.
Aircore drilling of gold and base metal targets (23 holes, total 1136 m) was undertaken following lag, rock chip and leach sampling and a review of previous aeromagnetic and drillhole data from three separate areas, 40 km west and 50 km north-west and...-
Document