The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release [made at SA Director of Mines' discretion] : Kingoonya. First annual report for the period 8/10/2012 to 7/10/2013.
An area centred ~120 km south-southeast of Coober Pedy is being explored for possible economic metallic mineralisation that may have formed in >800 m deeply buried Proterozoic to Archaean volcanic and metamorphic basement rocks, or also within the...-
Document
Published: 10 Dec 1913
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
South Tent Hill and North Tent Hill. Joint annual reports submitted until licences' expiry/renewal, for the period 20/10/2005 to 19/10/2010.
Two adjoining licence areas located immediately west and north-west of Port Augusta, which cover the southern end of the Cariewerloo Basin and extend north-westwards for 60 km, are being explored for possible economic unconformity-style uranium...-
Document
Published: 14 Dec 1910
-
Lake Younghusband. Annual reports and partial surrender reports to licence expiry/full surrender, for the period 5/12/2005 to 4/12/2009.
An area located approximately 30 km east of Glendambo was taken up to explore primarily for possible economic buried sedimentary uranium mineralisation within the Tertiary cover sequence, and secondarily for possible unconformity - related uranium...-
Document
Published: 14 May 1910
-
Oak Dam (part of the Gawler Craton Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 17/7/2006 to 16/7/2011.
EL 3603, located on the Stuart Shelf approximately 50 km south of Olympic Dam, was taken under licence to explore for possible economic iron oxide - associated copper-gold-uranium (IOCG-U) deposits of Olympic Dam style that may have formed in...-
Document
Published: 28 Sep 1911
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
Koolcutta (part of the Pandurra Project). First partial surrender report, for the period 29/3/2011 to 28/3/2013.
107 square km or ~20% of the former area of EL 4708 have been relinquished because of their perceived diminished prospectivity for possible buried unconformity-related uranium mineralisation that may have formed within arenaceous sediments of the...-
Document
Published: 18 Nov 1913
-
Coondambo. Annual reports and final report to licence expiry/full surrender, for the period 7/6/2001 to 4/7/2011.
An area located close to the western margin of the Stuart Shelf, and approximately 120 km south-west of the Olympic Dam deposit, was taken up to explore for possible economic IOCG mineralisation hosted by Gawler Range Volcanics (GRV) and Hiltaba Suite...-
Document
Published: 13 Apr 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918