Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
RB 78/00038 Report on drilling in the Tallaringa palaeodrainage system.
Programme of fully cored shallow holes. Aim was to investigate stratigraphy of the palaeochannels, relate this to the geology and evaluate economic potential of channel confined sediments, to test for lignite, sedimentary uranium, alluvial gold, heavy...-
Document
Published: 01 Jan 1978
-
Pureba Conservation Park, Nunnyah Conservation Reserve, Koolgera Conservation Reserve, Jellabinna, Ooldea South and Ooldea Range (part of the Eucla Basin Project). Joint first partial surrender report, for the period 27/10/2004 to 31/1/2009.
Exploration for possible economic heavy mineral sands carried out by Iluka Resources within the now relinquished portions of its multi-licence acreage has comprised aircore drilling of the Cainozoic sedimentary sequence (173 holes for a total...-
Document
Published: 31 Jan 1909
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 1910
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
Indooroopilly. Final report at licence full surrender, for the period 23/2/1977 to 19/10/1977.
TARGET: Possible sedimentary uranium occurrences where radiometric anomalies are associated with playa lakes in the lower reaches of the Garford Palaeochannel. EXPLORATION: Ground magnetic and radiometric surveys over 4 lakes, ground reconnaissance...-
Document
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
Cummins. Progress reports to licence expiry/renewal, for the period 11/11/1971 to 10/11/1972.
In order to appraise a potentially economic discovery of very pure, high reflectivity kaolin clay located near Kapinnie on southern Eyre Peninsula, a drilling programme is planned by Endeavour Oil which aims to outline around 33 million tons of kaolin...-
Document
Published: 15 Nov 1972
-
RB 73/00085 Preliminary notes on the geology of the eastern margin of the Eucla Basin, FOWLER 1:250 000 sheet area.
This report deals with the stratigraphy and economic geology of an area on the eastern margin of the Eucla Basin and the western margin of the Gawler Block. The area is centred upon the FOWLER 1:250 000 map area. The stratigraphic section of the...-
Document
Published: 01 Jan 1973
-
Wildingi Claypan (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 5/10/2005 to 13/1/2015.
Two separate small areas located just north of Comet Outstation, that were originally taken up to explore for possible diamonds and Triassic-Jurassic kimberlite intrusions that could be associated with intensely faulted shallow basement, have also...-
Document
Published: 19 Dec 1914
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 1 of 2].
As part of a continuing search for possible economic, zircon-rich Tertiary marine placer mineral sands deposits within its tenement holdings in the eastern Eucla Basin, licensee Iluka Resources carried out scout drilling on ELs 3163, 3201 and 3203...-
Document
Published: 01 Sep 1910
-
Trial Well. Progress and final reports to licence surrender for the period 15/6/79 to 4/1/82.
TARGET: An assessment of the potential for uranium and lignite deposits within the Eocene Pidinga Formation, and separate investigations of coincident, possible Olympic Dam target type magnetic and gravity anomalies in the crystalline Precambrian...-
Document
-
Warrior. Progress reports for the period 4/4/79 to April 1982.
The licence was relinquished following conduct of intensive exploration in the Malbooma area since 1973. Drilling of 514 percussion holes (totalling 21 355 metres) and 29 cored holes (totalling 1 111 metres) defined widespread uranium mineralisation,...-
Document
Published: 01 Jan 1982
-
Darke Peak (part of Caralue Project). Final report for the period 29/4/1974 to 16/10/1974.
Investigations by Urangesellschaft of previously recorded aerial radiometric anomalies above sedimentary cover in the vicinity of outcropping granite at Carapee Hill, which body contains sporadic low grade uranium mineralisation, have included...-
Document
-
Seven Mile Swamp and Chundie Swamps. Progress reports to licence expiry/renewal, for the period 16/6/1969 to 15/6/1970.
Following on from the conduct of both preliminary airborne and carborne radiometric surveys in an area 60 miles north of Penong, which disclosed numerous anomalies with potential for finding uranium occurrences, the locality was taken up and...-
Document
Published: 22 Jun 1970
-
Ooldea. Progress and final reports to licence expiry/full surrender, for the period 16/11/1972 to 15/11/1973.
In a search for possible economic roll-front sedimentary uranium deposits thought to be hosted by Middle Eocene Pidinga Formation fluvial and lacustrine terrestrial sediments deposited in the eastern Eucla Basin, 13 scout RAB/RC open holes were...-
Document
-
Chundie Swamps. Progress reports and final report to licence full surrender, for the period 29/11/1974 to 7/7/1976.
As part of a continued search for possible Proterozoic - Cainozoic unconformity - related, concealed sedimentary uranium deposits in an area of the Eucla Basin located 60 km north of Fowlers Bay, Pechiney conducted geological reconnaissance, ground...-
Document