-
Brimpton Lake. Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 22/10/2001 to 21/10/2004.
Following the farm-in of Anglo American Exploration to this tenement in March 2003, new activity has focussed on the rapid definition of drilling targets in a search for possible Archaean basement volcanic or sediment-hosted base metal massive...-
Document
Published: 21 Oct 1904
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Smoky Bay. Progress and surrender reports for the period 1/5/1997 to 1/9/2000.
Exploration in an area centred on Smoky Bay, 40 km south-east of Ceduna, targeted shear - hosted mineralisation associated with granitoids of the Hiltaba and St Peter Suites. Several lineaments were identified from aeromagnetic data. Undertaking...-
Document
Published: 01 Sep 1900
-
Minnipa. Data release made in lieu of submitting a first partial relinquishment report : annual reports for the period 7/6/1996 to 6/6/1999.
Within an area spanning the Eyre Highway between Pygery and Karcultaby, acquisition of an airborne magnetic/radiometric survey was followed by calcrete geochemical sampling. Twenty-eight aircore holes (total 1616 m) were drilled at three prospects to...-
Document
Published: 15 Nov 1999
-
Ceduna. Annual reports and final report to licence full surrender, for the period 31/8/1996 to 17/7/2000.
Joint venture exploration over an area extending for 40, 35 and 50 km respectively west, north and east of Ceduna targeted Archaean and Proterozoic Yarlbrinda - style Au and Ernest Henry / Olympic Dam style Cu-Au associated with shear zones and...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
Karanda. First annual report plus final report to licence expiry/full surrender, for the period 13/6/2013 to 12/6/2015.
A small area centred ~50 km west-southwest of Kimba has been explored for possible buried base metal mineralisation, including BIF type iron ore, and also for gold and perhaps palaeochannel style uranium, that may have formed within or close to...-
Document
Published: 12 Aug 1915
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006
-
Elliston, western Eyre Peninsula. Annual reports and final report to licence full surrender, for the period 21/2/1996 to 23/12/1998.
Diamond, gold and platinum group element (PGE) exploration activities carried out within an area of known kimberlitic and lamproitic intrusive rocks east of Elliston comprised aircore drilling (23 holes, total 1188 metres), addressing 17 out of 36...-
Document