-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
Kimba area (Caralue Bluff). Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 9/6/1986.
An intensive search for possible banded iron formation - related Proterozoic stratiform lead-zinc mineralisation, of Gamsberg / Aggeneys / Broken Hill style, over an area surrounding Kimba on Eyre Peninsula, has included aerial magnetic and...-
Document
-
Sleaford. Partial surrender report for the period 13/2/1998 to March 1999.
Lag / laterite sampling and a geophysical data review of an area of concealed basement 25 km south-west of Port Lincoln, searching for granulite facies - hosted gold deposits within the Archaean Sleaford Complex, plus possible shear - related...-
Document
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Cootra. Progress and final reports to licence surrender for the period 25/11/80 to 28/3/84.
Pioneer exploration for possible stratabound base metal deposits that have a facies relationship to metamorphic iron deposits, which was carried out in the Cootra area, located 20 km east south-east of Warramboo on central Eyre Peninsula, has...-
Document
Published: 09 Apr 1984
-
Triple Hill. Progress reports to licence expiry/full surrender, for the period 10/7/1979 to 4/10/1982.
Exploration for possible buried occurrences of unconformity-related uranium mineralisation, undertaken within an area located approximately 26 km west-southwest of Cowell on eastern Eyre Peninsula, has included the acquistion during July 1979 of a 500...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Cleve West. Progress reports and final report to licence full surrender, for the period 25/9/1979 to 27/1/1985.
The target within an area centred ~35 km north-west of Cleve was massive stratiform Broken Hill and Aggenys style base metals mineralisation associated with the Lower and Upper Middleback Jaspilite units of the Hutchison Group. A world class sized...-
Document
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914