Stuart Creek. Progress reports to licence expiry/renewal, for the period 13/5/1977 to 12/5/1979.
Stratiform base metal sulphide deposits and sedimentary uranium accumulations were targeted in the Stuart Creek area, which straddles the Torrens Fault on the eastern margin of the Stuart Shelf. Two airborne magnetic and radiometric surveys totalling...-
Document
-
Woomera, Emmie Bluff, Salt Creek, Portulacca Ridge and Red Lake. Progress reports for the period 21/8/1979 to June 1983.
Continuing exploration in the Woomera area has included the acquisition of a ground magnetic and gravity survey over the Buller Dam anomaly, which lies on the western flank of the Acropolis aeromagnetic anomaly, and this work confirmed that the former...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
RB 91/00066 Major South Australian gold deposits. Summaries.
This report summarizes information on 10 South Australian mineral deposits with individual aggregate gold resources and/or historic production of 1 tonne or more. By far the largest is the Olympic Dam Cu-U-Au-Ag deposit, with a measured and indicated...-
Document
Published: 01 Jun 1991
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Oakden Hills. Annual reports plus final report to licence expiry/full surrender, for the period 12/12/2018 to 11/12/2022.
A small area centred ~50 km south-east of Woomera, in hilly terrain just west of Pernatty Lagoon, was taken up to cover an EM conductor identified from a recently flown SA Government SkyTEM survey, which coincides with a weak regional magnetic...-
Document
Published: 15 Dec 1922
-
Data release - as updated [made at SA Director of Mines' discretion] : Oakden Hills area. Annual technical report for the period ending 11/10/2018.
Exploration Licence 6030 "Bookaloo North Project", is located 105km north of Port Augusta and 30km south-southwest of the Mt Gunson Cu-Co Deposit. The tenement is largely covered by Quaternary alluvial gravels and sand plain deposits including three...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Cultana. Progress reports to licence expiry/renewal, for the period 28/10/1975 to 27/10/1977.
Exploration for possible stratiform or hydrothermal/epithermal base and precious metals within Adelaidean metasedimentary cover and Middle Proterozoic crystalline basement in the Cultana area, 35 km south-southwest of Port Augusta, has consisted of...-
Document
-
Woocalla (part of the Mount Gunson Project). Fourth partial surrender report for the period 4/8/1995 to 29/10/2009.
As part of a project examining the sequence of Adelaidean cover rocks that surrounds the Pernatty Culmination on the southern Stuart Shelf for possible economic stratiform copper mineralisation of the various styles known to be present in the Mount...-
Document
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Portulacca Ridge. First partial surrender report, for the period 16/3/1977 to 31/3/1982.
A large part of the subject licence area in the Woomera region, that has been explored over several years for possible basement-hosted Olympic Dam style base and precious metal deposits, has been relinquished, mainly in places where the depth to the...-
Document