Outalpa. Progress and final reports to licence surrender for the period 8/6/1972 to 15/4/1973.
Exploration of an area located approximately 10 miles north of Manna Hill, seeking possible economic Zambian Copperbelt style stratabound copper deposits, has consisted only of an orientation geochemical survey followed by field inspection of...-
Document
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
RB 98/00022 Review of open file company exploration data from the early 1980s to mid-1997, over the Yunta, Winnininnie, Anabama and Oakvale 1:100 000 map sheets, OLARY 1:250 000 map sheet, South Australia.
Significant exploration focussed on: · stratabound 'Telfer-style' gold in Adelaidean metasediments in the Nackara Arc, using stratiform or stratabound structurally-controlled genetic models; and structurally controlled gold and base metal...-
Document
Published: 01 Jul 1997
-
Morialpa. Progress, annual and final reports to licence expiry/full surrender for the period 9/2/2003 to 8/2/2006.
Subsequent to a partial relinquishment of ground and related data release made in August 2003, ongoing exploration conducted over a small area located about 25 km north-northwest of Manna Hill township, looking for possible Zambian type stratiform...-
Document
-
Morialpa. Data release made in lieu of submitting a first partial surrender report : progress reports and annual reports for the period 16/12/1995 to 8/8/2003.
Initial exploration for stratiform Cu-Au mineralisation hosted within Adelaidean sediments in the Morialpa area, 40 km north- west of Olary, comprised soil, stream sediment, rock chip and ironstone lag geochemical sampling, and 1:10,000 scale...-
Document
Published: 29 Aug 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 10/12/2009 to 9/12/2018.
An area consisting of three separate sub-blocks located ~20 to 35 km north-east of Olary and ~20 km east of Cutana is being explored for possible economic gold as basement shear and vein hosted style deposits, as well as for possible extensions of the...-
Document
-
Walparuta. Annual reports and final report to licence expiry/full surrender, for the period 21/6/2010 to 20/6/2019.
A small area centred ~30 km west of Olary has been explored for possible economic buried primary stratiform base metal sulphide mineralisation, vein barite mineralisation and also for epithermal copper-gold deposits that may have formed in...-
Document
-
Data release [made at SA Director of Mines' discretion] : Border JV Project. Joint annual reports for the period 1/1/2015 to 31/12/2016.
During the first year of joint reporting for the five licences which are now subject to an amalgamated exploration expenditure agreement, work commenced with the acquisition of 31 line km of ground magnetic survey data over 9 proposed drill sites for...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Luxemburg Well. Progress and final reports for the period 4/11/83 to 3/11/84.
Diamond drillcore obtained from the Luxemburg mine area, which was drilled by Sundowner Minerals Pty Ltd in 1969-70, was assayed and identified as consisting of altered pyroxenite, altered granitoids (adamellite, granodiorite, tonalite), and altered...-
Document
-
Cutana. Data release made in lieu of submitting a second partial surrender report, for the period 10/12/2009 to 9/12/2018.
52 square km or ~24.9% of the former area of EL 5585 has been relinquished.-
Document
Published: 20 Mar 1919
-
Dingo Dam. Combined first progress and final report to licence surrender, for the period 30/4/1993 to 22/10/1993.
Exploration conducted primarily for possible economic Broken Hill - style stratiform/stratabound Proterozoic base and precious metal mineralisation in the Dingo Dam area, located 60 km south-east of Olary, comprised a review of previous work that had...-
Document
-
Manna Hill [not 'Mannahill']. Progress reports to licence expiry/full surrender, for the period 16/10/1987 to 15/1/1990.
TARGET: Possible concealed, saddle-reef type lode developments of inferred Telfer-style gold deposits at the Manna Hill Goldfield. EXPLORATION: Reconnaissance inspection of old mine workings, rock chip sampling (79), and shallow RAB bedrock drilling...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Olary region. Progress and annual reports for the period 23/9/1976 to 22/9/1978.
Intensive exploration of granitoid environs in the Crocker Well area has outlined new areas of, and extended known areas of, primary uranium mineralization. A regional field evaluation was also made of the Glenorchy and Plumbago areas, leading to the...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Furlough Dam. Progress reports for the period 28/7/80 to 27/4/81.
Results of the deep stratigraphic / mineral exploratory well MU-2 drilled near Mulyungarie Homestead, east of Lake Frome and adjacent to the SA/NSW State border, are presented, besides the interpretation of a gravity survey conducted earlier in the...-
Document
Published: 17 Nov 1981
-
ComRev 008 Iron Ore in South Australia 2000
The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo West. Annual reports for the period 15/11/2005 to 14/11/2009.
There is no abstract created for this record-
Document
Published: 26 Nov 1909