-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-21 - Uranium Equities Limited, Marla Project, Proterozoic basement magnetic and gravity anomaly IOCGU targets. Drilling project final report.
Uranium Equities, the licensee parent and operator of the seven Marla Project tenements, is exploring them with the aim of discovering economic iron oxide - associated copper–gold±uranium (IOCGU) deposits, that it considers may have given rise to a...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 1916
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-19 - Golden Cross Operations Pty Ltd, Coober Pedy Project, G2 Lineament Corridor gravity/magnetic anomaly IOCG targets. Drilling project final report.
Golden Cross Operations Pty Ltd ('Golden Cross') commenced mineral exploration activities in South Australia with the objective of discovering significant IOCG deposits with the potential to support a major mining operation. In mid-2009, four tenement...-
Document
Published: 25 Nov 1913
-
Giddinna (part of the Gawler Craton Project). Final report at licence expiry/full surrender, for the period 28/2/2011 to 27/2/2016.
EL 4695 Giddinna, consisting of three separate small sub-blocks, was pegged as strategic acreage to provide continuity with two other pre-existing Golden Cross tenements in the Coober Pedy Group, ELs 4427/5594 Oolgelima and 4966 Stuart Range, and was...-
Document
Published: 27 Mar 1916
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Data release - as updated : Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 29/11/2012 to 28/11/2020.
Since late November 2012, a number of areas in the northern central Gawler Craton and eastern Musgrave Province have been taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the...-
Document
Published: 01 Feb 1921
-
Mount Barry (part of Fortescue’s North-west Olympic Project). Final report at licence expiry/full surrender, for the period 3/8/2018 to 2/8/2020.
An area centred approximately 70 km east-northeast of Coober Pedy has been explored for possible economic buried IOCG-U type mineralisation. No field work was undertaken. Activities comprised in-house background research and a historic data...-
Document
Published: 03 Oct 1920
-
Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2012 to 28/11/2017.
Portions of a tenement located within the Nawa Domain basement rocks subcrop region of the northern Gawler Craton have recently been relinquished by Woomera Exploration (WEX) in order to meet exploration expenditure compliance conditions of its...-
Document
Published: 08 Mar 1918
-
ExpNotes GILES: Explanatory Notes GILES
Concealed basement on GILES comprises ?Archaean to Palaeoproterozoic metamorphic rocks belonging to the Nawa Subdomain of the Gawler Craton. These are intruded by Mesoproterozoic Hiltaba Suite granitic bodies and Mesoproterozoic or Neoproterozoic...-
Document
-
Bindabu Bore. Annual and final reports to licence expiry/full surrender for the period 19/11/2007 to 18/11/2009.
Exploration for possible economic iron oxide - associated copper-gold (IOCG) deposits formed in buried Archaean to Proterozoic basement of the western Mabel Creek Ridge has consisted only of desktop prospectivity studies carried out by a consultant....-
Document
Published: 30 Apr 1910
-
Mount Gordon. Combined first annual / final report at licence surrender for the period 25/2/2008 to 5/1/2009.
A small part of a semi-regional gravity survey was acquired within the subject licence area by Eromanga Uranium, during its assessment of the IOCG mineralisation potential of a significant gravity anomaly lying on its adjoining EL 4019 Nicholson to...-
Document
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 6 - Marla Project area, Todmorden ground gravity survey. Project PT1-06 final report.
To assist with exploration for possible buried large-scale deposits of iron oxide - associated copper-gold-uranium (IOCGU) mineralisation that may be related to significant coincident magnetic and gravity features identified within a west-northwest...-
Document
-
Mount Sarah 2 area (part of the Marla Project). First partial surrender report for the period 25/1/2011 to 24/1/2013.
As part of exploration for possible buried economic IOCGU type mineralisation formed within the structurally complicated basement region lying north and north-east of Marla, a detailed ground based gravity survey was conducted for the licensee during...-
Document
Published: 02 Jul 1913
-
Nicholson Hill and Welbourn Hill. Joint first partial surrender report, for the period 15/1/2008 to 12/10/2010.
As part of exploration for possible buried Proterozoic IOCG-U deposits in two small licence areas located approximately 50 km east of Marla, the only work carried out in the now relinquished licence portions was part of a gravity survey designed to...-
Document
-
Mount Sarah (part of the Marla Project). First partial surrender report for the period 25/1/2011 to 24/1/2013.
As part of exploration for possible buried economic IOCGU type mineralisation formed within the structurally complicated basement region lying north and north-east of Marla, a detailed ground based gravity survey was conducted for the licensee during...-
Document
Published: 02 Jul 1913