-
Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Karoonda. Final report at licence full surrender, combined with related partial surrender reports for Peake, Swan Reach, Waikerie and Malinong, covering the period 7/7/1980 to 6/7/1981.
Within the surrendered sections of the subject exploration licences in the Karoonda, Marmon Jabuk, Swan Reach, Blanchetown and Cooke Plains areas, following the conduct there of a 45.4 line km gravity survey and the drilling and geophysical logging of...-
Document
Published: 12 Jun 1981
-
Glenloth Well. Progress reports and final report to licence expiry/full surrender, for the period 30/3/1973 to 29/3/1974.
Two inclined percussion holes were drilled at the Mount Mitchell tin prospect for a total penetration of 504 feet. The aim was to test a discrepancy between subsurface sample negative tin assay results obtained by the Department of Mines, and good...-
Document
Published: 21 Feb 1974
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
RB 53/00058 Report on site investigation, Kimba Area School, Kimba Parklands, Hd Solomon.
The site for the proposed Kimba Area School occupies 8½ acres of the parklands in the north western corner of Kimba Township, with a gentle slope to northward. Test pits reveal mallee type soil profiles overlying weathered granite. The generalised...-
Document
Published: 01 Jan 1961
-
RB 59/00021 Aeromagnetic anomaly near Oakbank (29/7/1964).
There is no abstract created for this record-
Document
Published: 01 Jan 1967
-
RB 43/00054 Report on foundation test for silo at Wallaroo for SA Cooperative Bulk Handling Ltd.
Percussion boring of a proposed silo site on old slag dumps at Wallaroo shows approximately 15 feet of slag on deeply weathered granite basement but with thin old shore material on the latter on the seaward side. The site is geologically...-
Document
Published: 01 Jan 1956
-
RB 48/00069 Report on groundwater prospects, sections 15 and 23 Hd Charleston - W.H. Rudiger.
There is no abstract created for this record-
Document
Published: 01 Jan 1959
-
RB 48/00105 Report on groundwater prospects, Port Kenny School, Hd Wright.
There is no abstract created for this record-
Document
Published: 01 Jan 1959
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 79/00121 Uranno microgranite deposit for road sealing aggregate and rail ballast.
A quarry plan, designed to yield 100,000 cubic m of in-situ material, has been outlined in a microgranite outcrop on Eyre Peninsula which is located 15 km east of Cummins and 10 km south-east of the Uranno railway siding. Diamond drilling (3 inclined...-
Document
Published: 01 Oct 1979
-
RB 78/00118;Amdel 01236 Behaviour of potassium during weathering of potash-rich granite rocks at Mount Painter.
Electron microprobe analysis was carried out on 3 brecciated samples to establish whether feldspar grains have identifiable overgrowths and if these are consistent with the feldspar having grown in low temperature, low pressure conditions.-
Document
Published: 01 Jan 1978
-
RB 97/00028 Reconnaissance granite sampling of the Mesoproterozoic Hiltaba Suite granite on northern Eyre Peninsula, South Australia, for dimension stone.
Reconnaissance sampling of Mesoproterozoic Hiltaba Suite granite on northern Eyre Peninsula, to identify all potentially quarryable granite varieties, was carried out by MESA during 1996/97. A total of 157 outcrops were inspected and 99 samples...-
Document
Published: 01 Apr 1998
-
RB 96/00037 Report on a groundwater search program over various Pitjantjatjara Homelands in the Musgrave Ranges area, South Australia.
The search by MESA for potable groundwater incorporated the use of Transient Electromagnetics, a ground resistivity method. This successfully provided drilling targets at two sites, Blue Hills and Wallatinna, but was unsuccessful in areas with shallow...-
Document
Published: 01 Nov 1996
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document