-
Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 79/00121 Uranno microgranite deposit for road sealing aggregate and rail ballast.
A quarry plan, designed to yield 100,000 cubic m of in-situ material, has been outlined in a microgranite outcrop on Eyre Peninsula which is located 15 km east of Cummins and 10 km south-east of the Uranno railway siding. Diamond drilling (3 inclined...-
Document
Published: 01 Oct 1979
-
RB 93/00017 Physical properties of South Australian building stones.
A program of testing of physical properties of South Australian building stones has been carried out on 30 samples representing: - Seven granite samples from four localities - One marble sample - Thirteen slate and flagstone samples from nine...-
Document
Published: 01 Mar 1993
-
RB 93/00026 Pulpara Kia Ora Bendigo bedrock drilling programme, 1992.
During the period September to December 1992, as part of the SA Exploration Initiative (SAEI), SADME completed an investigative drilling programme of concealed bedrock in the area of the Delamerian Bendigo Granite and surrounding metasediments of...-
Document
Published: 01 Jun 1993
-
RB 97/00028 Reconnaissance granite sampling of the Mesoproterozoic Hiltaba Suite granite on northern Eyre Peninsula, South Australia, for dimension stone.
Reconnaissance sampling of Mesoproterozoic Hiltaba Suite granite on northern Eyre Peninsula, to identify all potentially quarryable granite varieties, was carried out by MESA during 1996/97. A total of 157 outcrops were inspected and 99 samples...-
Document
Published: 01 Apr 1998
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
RB 89/00070 Gawler Ranges Excursion, October 7th-9th, 1989.
Summarises the chemical classification and macroscopic visual attributes of basement igneous rocks seen in outcrop within the regional geological settings of northern Eyre Peninsula and the Gawler Ranges.-
Document
Published: 01 Sep 1989
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-45, Old Well and New Well shear-associated gold mineral prospects. Project final report.
The Yarlbrinda and Yerda Shear Zones of the central Gawler Craton, partly present within EL 3107 in the Tarcoola-Glenloth-Lake Harris region, were the target for a number of mineral exploratory drillholes put down there by by licence farminee Minotaur...-
Document
-
Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Mount Mary. Combined first annual/final report at licence expiry/full surrender for the period 14/4/2008 to 13/4/2009.
During initial exploration of the Mount Mary area, located approximately 120 km north-east of Adelaide, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread...-
Document
Published: 14 Apr 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-05 - Netley Hill porphyry style Cu-Mo mineral prospect. Project final report.
Remodelling and re-interpretation of the geological and geophysical signatures of the Netley Hill prospect by the EL 3848 Joint Venture has indicated good potential for discovering a large porphyry copper-gold deposit at depth, beneath historical...-
Document
Published: 14 May 1908
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document