-
Hanns Hill. Progress reports for the period 19/1/81 to 6/12/82.
Follow up to stream sediment sampling near Oodnadatta in the Mount Dutton area suggests that anomalous nickel, chromium and cobalt values are associated with ironstone, and anomalous niobium with geodes. No kimberlites were discovered.-
Document
Published: 01 Jan 1982
-
Primrose Hill. First partial relinquishment report for the period 13/8/2007 to 12/8/2008.
In a search for possible economic buried IOCG type mineralisation within inferred Proterozoic basement, a new regional gravity survey incorporating the subject EL 3890 Primrose Hill and Minotaur's adjacent EL 3944 Sunny Creek was undertaken in July...-
Document
-
Primrose Hill. Annual and final reports to licence expiry/full surrender for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 60 km north of William Creek, looking for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within inferred concealed Proterozoic basement east of the Peake and Denison...-
Document
Published: 12 Oct 1909
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-33 - north-eastern Gawler Craton - Douglas Creek gravity anomaly Mesoproterozoic basement IOCG mineral prospect. Project interim and final reports.
The north-eastern margin of the Gawler Craton is prospective for Mesoproterozoic iron oxide - associated copper-gold (IOCG) style mineralisation, but the considerable depth to crystalline basement, combined with the presence of an artesian Mesozoic...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Eaglehawk Dam (part of the Woodmurra Project). Combined first annual/final report to licence expiry/full surrender, for the period 25/11/2015 to 24/11/2016.
An area centred ~70 km south-east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
-
Mount Toodla. Combined fourth annual and final report at licence surrender, for the period 3/5/1999 to 2/5/2003.
The targets of exploration in the Mt Toodla area, situated 50 km south-east of Oodnadatta, were concealed deposits of Olympic Dam style Cu-Au-U-REE and Fe-oxide Cu-Au (IOCG) style mineralisation having less than 200 m thickness of cover. Work...-
Document
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
Mount Toodla. First partial surrender report, for the period 3/5/1999 to 12/5/2002.
The targets of exploration in the Mt Toodla area, located 50 km south-east of Oodnadatta, were Olympic Dam style Cu-Au-U-REE and Candelaria style Fe-oxide Cu-Au mineralisation in Palaeoproterozoic and Mesoproterozoic metamorphic basement with less...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Mount Carulinia. Annual reports to licence expiry/full surrender, for the period 11/10/2012 to 10/10/2018.
An area located ~10 km west of Oodnadatta, which lies near the northern margin of the Gawler Craton, was taken up to encompass a large 240 nT magnetic anomaly with a coincident 16 mGal gravity anomaly, that it was believed had aspects analogous to the...-
Document
Published: 08 Jan 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917