-
Lake Woorong and Coober Pedy (the Mount Brady Project). Joint annual reports and final report to licence expiry/full surrender, for the period 7/1/2002 to 6/1/2005.
Two areas lying respectively south and south-west of Coober Pedy have been explored for Proterozoic basement-hosted iron oxide copper-gold deposits of Olympic Dam and Prominent Hill type, for Broken Hill style base metal mineralisation, and for craton...-
Document
Published: 04 Feb 1905
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-14, Willow IOCG mineral prospect. Project interim and final reports.
Bimbowrie EL 3278 is located within the Palaeoproterozoic Olary Domain of the Curnamona Province, South Australia. The property is prospective for a variety of mineralisation styles including granite batholith primary (hard-rock) uranium, Broken Hill...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Todds Dam (part of the Lake Torrens Project). Second partial surrender report, for the period 10/3/2004 to 29/4/2016.
Approximately 61% of a small licence area located immediately north-west of the Olympic Dam deposit has been relinquished under the terms of the Lake Torrens Project Amalgamated Expenditure Agreement. Only minimal work has been performed on the...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
White Hill. Annual reports to licence expiry/full surrender, for the period 28/11/2014 to 27/11/2016.
A licence area consisting of two sub-blocks that are respectively situated to the west and the south-west of White Hill, within the Christie Domain close to the western margin of the Mount Woods Inlier and ~40 km distant from Prominent Hill, was taken...-
Document
Published: 12 Dec 1916
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
Lake Torrens Station and Hawker West (the Torrens Project). Joint annual reports, plus separate final reports to licences' respective full surrender, for the period 30/4/2003 to 1/6/2010.
Olympic Dam style copper-gold mineralisation was the target of exploration in two adjoining areas which lie about 100 km north-northeast of Port Augusta and 55 km west of Hawker, on alluvial plains adjacent to south-eastern Lake Torrens. All of the...-
Document
Published: 30 Nov 1910
-
Burt Lagoon, Kallioota, Emu Lookout, Mount Norwest and Hookina (the BHPB Lake Torrens Project). Joint annual reports and joint final report to licences' joint full surrender, for the period 27/6/2012 to 10/3/2015.
After BHP Billiton (BHPB) gained ownership of two of the subject exploration licences, and later was granted another three in its own right, the licence group as a whole (now called the Lake Torrens Project) continued to be explored primarily for...-
Document
Published: 01 Apr 1915
-
Eastern Lake Torrens Plains area. Progress and [final] annual reports to licence expiry/renewal, for the period 22/10/2001 to 21/4/2003.
Olympic Dam style copper-gold mineralisation was the target of exploration in an area which lies about 100 km north-east of Port Augusta, and adjacent to south-eastern Lake Torrens. All of the available aeromagnetic data for this area were...-
Document
-
Bute. Progress reports to licence expiry/full surrender, for the period 28/11/1977 to 27/2/1979.
Stratigraphic deep drilling carried out by the South Australian Government since 1968 in the Bute - Port Broughton region of northern Yorke Peninsula (in total 21 diamond drillholes and 16 rotary drillholes) has outlined the nature and subsurface...-
Document
-
Merna Mora (Warrakimbo area). First annual / final report to licence expiry for the period 25/6/2002 to 24/6/2003.
Re-interpretation of available geophysical data in an area of historic copper workings situated near to and north of Hawker showed a broad regional gravity high. A detailed ground gravity survey confirmed that the area is characterised by a large...-
Document
-
Chitanilga Hill. First partial surrender report for the period 12/6/2003 to 11/6/2005.
Half of EL 3100, comprising the north-eastern and southern parts of its original extent across the northern Gawler Ranges bordering the adjacent shores of Lakes Harris, Gairdner and Everard, has been relinquished by the licensee after an...-
Document
-
Parakylia. Annual reports to licence expiry/full surrender for the period 9/10/2006 to 8/10/2008.
In December 2006 the subject licensee Tasman Resources signed a joint venture agreement with WCP Resources, whereby that farminee company would earn up to a 65% interest across all of the Lake Torrens Project licences through conducting exploration of...-
Document
Published: 08 Dec 1908
-
Tregalana. Data release made in lieu of submitting a licence first partial surrender report: annual reports for the period 22/2/2001 to 21/2/2005.
Exploration of an area located 30 km south-west of Port Augusta initially sought possible Olympic Dam style iron oxide-hosted copper-gold deposits within concealed Mesoproterozoic basement, plus Mount Gunson style stratabound copper in the overlying...-
Document
Published: 30 Mar 1905
-
Ingomar Station and Phar Lap Outstation (part of Ingomar JV Project). Joint annual plus separate annual and final reports to licences' expiry/full surrender, for the period 13/6/2002 to 23/7/2007.
Work done on two licences covering inferred Challenger - type vein gold or Olympic Dam / Prominent Hill style IOCG mineralisation - prospective ground that is situated approximately 70 km to the south and south-east of Coober Pedy has been confined to...-
Document
Published: 22 Aug 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-06, Benagerie Ridge Joint Venture area iron oxide - associated copper-gold mineral prospects. Project interim and final reports.
The PACE Initiative drilling collaboration proposal DPY3-06 was formulated to drill test three gravity - (magnetic) anomalies seen along the buried Benagerie Ridge area of the Curnamona Province of South Australia, on EL 3019 (Quinyambie Station)...-
Document