-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
RB 89/00051 Cowell Jade Province: Detailed geological mapping and diamond drilling of jade and ornamental marble outcrops, 1982-1987. Volume 1.
Detailed mapping undertaken between 1982 and 1987 of 48 known jade outcrops located in the Cowell - Cleve area, and diamond drilling of 3 jade outcrops and 2 ornamental marble prospects, has identified many factors controlling nephrite formation. The...-
Document
Published: 01 Jan 1992
-
RB 93/00044 Yeelanna RC Drillhole Project: Well completion report.
In order to investigate the geology and mineral potential of an area of shallowly-concealed basement with parallel N-S trending magnetic features, located in the Cummins - Yeelanna region of southern Eyre Peninsula, SADME over February-June 1993...-
Document
Published: 01 Nov 1993
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.
An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...-
Document
Published: 12 Dec 1914
-
Eyre Peninsula Pb-Zn data package.
Numerous Pb-Zn-Cu-Ag mines and prospects, including the promising Menninnie Dam prospect located 80 km north of Kimba, occur within graphitic, calcareous and psammo-pelitic metasediments of the Palaeoproterozoic (ca 1900-1850 Ma) Hutchison Group on...-
Document
Published: 01 Jan 1991
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Mount Middleback (part of the East Eyre Peninsula Project). Annual reports and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2012.
A small licence area consisting of three separate portions, located approximately 30 km west-southwest of Whyalla, has been explored for possible economic, basement granitoid intrusion - related buried IOCG and vein style uranium mineralisation, as...-
Document
Published: 14 Nov 1912
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Sheoak Hill. Annual reports, partial surrender report and final report to licence surrender, for the period 9/7/1997 to 8/7/2002.
An area centred 60 km north-west of Cowell was considered prospective for iron mineralisation within banded iron formations of the Middleback Subgroup, and for skarn - type gold and base metals associated with Hutchison Group metasediments. Following...-
Document
-
Mangalo. Second partial surrender, annual reports for the period 16/4/1997 to 15 April 2001.
Following on from calcrete sampling in the vicinity of Mangalo, reported earlier (Env. 9583), limited field reconnaissance and collection of rock samples was undertaken over selected subtle geological/geophysical anomalies, that had been identified...-
Document
Published: 02 Nov 1901
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909
-
Mount Messenger. Progress reports and final report to licence expiry/full surrender, for the period 27/11/1992 to 26/11/1994.
Lead-zinc exploration undertaken in the vicinity of Mount Messenger, and which also covered an area extending from 5 km to 50 km south-eastwards of Kimba, comprised the acquisition during November 1993 of a 4386.5 line km airborne magnetic /...-
Document
-
Lake Gilles. Progress reports, annual reports and final report to licence full surrender, for the period 3/6/1991 to 16/4/1996.
Exploration for possible buried stratabound base metal deposits within Hutchison Group metasediments east of Kimba comprised an airborne magnetic-radiometric survey, ground magnetic surveys, RC drilling (338 holes, total 14,663 m) and one 279 m deep...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-33, central eastern Eyre Peninsula, Ethiopia radiometric target Proterozoic mesothermal / metamorphic basement uranium prospect. Project final report.
Adelaide Resources made application for PACE Initiative Year 4 funding in 2006 (Project DPY4-33) to drill for possible primary uranium mineralisation, following the identification of a spectral anomaly that arose from the reprocessing of radiometric...-
Document
-
RB 2012/00019 Geochemistry of pre-1570 Ma mafic magmatism within southern Australia: implications for possible tectonic settings and timing of major mineralisation events in South Australia.
Geochemical and isotopic data from mantle-derived mafic rocks provide important constraints on our understanding of the composition and evolution of the lithosphere through time. Since the lithosphere is sensitive to tectonic processes such as...-
Document
Published: 01 Dec 2012
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document