-
Brimpton Lake. Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 22/10/2001 to 21/10/2004.
Following the farm-in of Anglo American Exploration to this tenement in March 2003, new activity has focussed on the rapid definition of drilling targets in a search for possible Archaean basement volcanic or sediment-hosted base metal massive...-
Document
Published: 21 Oct 1904
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Smoky Bay. Progress and surrender reports for the period 1/5/1997 to 1/9/2000.
Exploration in an area centred on Smoky Bay, 40 km south-east of Ceduna, targeted shear - hosted mineralisation associated with granitoids of the Hiltaba and St Peter Suites. Several lineaments were identified from aeromagnetic data. Undertaking...-
Document
Published: 01 Sep 1900
-
Minnipa. Data release made in lieu of submitting a first partial relinquishment report : annual reports for the period 7/6/1996 to 6/6/1999.
Within an area spanning the Eyre Highway between Pygery and Karcultaby, acquisition of an airborne magnetic/radiometric survey was followed by calcrete geochemical sampling. Twenty-eight aircore holes (total 1616 m) were drilled at three prospects to...-
Document
Published: 15 Nov 1999
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Ceduna. Annual reports and final report to licence full surrender, for the period 31/8/1996 to 17/7/2000.
Joint venture exploration over an area extending for 40, 35 and 50 km respectively west, north and east of Ceduna targeted Archaean and Proterozoic Yarlbrinda - style Au and Ernest Henry / Olympic Dam style Cu-Au associated with shear zones and...-
Document
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Central Gawler Gold Province Prospect Scale. Final report, Project ADI RD03-419 [Accelerated Discovery Initiative Round 3, 2022]. CSAMT and Loupe TEM Survey Method Assessment Report, February 2023.
Lady Alice Mines was successful in receiving funding in the third round of The Accelerated Discovery Initiative (ADI). This funding was provided to allow for the assessment of Controlled Source Audio-Magnetotellurics (CSAMT) and Loupe TEM ground...-
Document
Published: 28 Feb 1923