-
2008 Limestone Coast Geothermal Project. Technical Work Progress Post Scopenergy Prospectus (GELs 170,171, 172 & 173). Thermal conductivity and geothermal assessments (GEL 170 ).
Technical Work Progress Post Scopenergy Prospectus Graeme Beardsmore and Steven Sewell March 2008: In December 2005, Scopenergy Pty Ltd produced a Prospectus as part of a proposed listing on the Australian Stock Exchange. This included a detailed...-
Document
-
2014 PEL629 Otway Basin 2D Seismic Reprocessing.
in 2014, Ouro Preto Pty Ltd engaged the services of Dayboro Geophysical to undertake seismic reprocessing in tenement PEL629. In total 60 lines comprising some 1060 line km’s were reprocessed. The lines reprocessed were selected on the basis of their...-
Document
Published: 01 Jan 2014
-
2017 Dundinna 3D Seismic Survey Reprocessing.
In 2017 Senex Energy Ltd contracted Dayboro Geophysical Ltd to re-process the 2013 Dundinna 3D Seismic Survey. Area processed was 1045 SqKM.-
Document
Published: 01 Jan 2017
-
2021 Neritus_Modiolus_Calpurnus 3D Merge Reprocessing.
Beach Energy Ltd contracted Velseis Processing Pty. Ltd. to re-process approximately 650 square kilometres from the 2006 Neritus, 2008 Modiolus and 2010 Calpurnus 3D Seismic Surveys. The processing of the NMC merge project took place in the Brisbane...-
Document
Published: 19 Jun 2023
-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Report on radiometric prospecting on EL 867.
Report on radiometric prospecting on EL 867 Very low uranium anomalism is associated with the Katunga Dolomite; no Middle Proterozoic overburden is located within EL 867. The anomalous alkaline syntectonic granites are of deep origin and faulting and...-
Document
Published: 01 Jan 1982
-
Lake Yantawena (West). Progress and final reports for the period 26/11/1970 to 25/11/1972.
Acquisition and interpretation of an airborne scintillation spectrometer survey, and the unhindered drilling and gamma and electric logging of 16 rotary open holes (total 3242 feet), were undertaken. Lower Tertiary non-marine palaeochannel sand...-
Document
Published: 09 Feb 1973
-
Nullarbor. Progress reports for the period 11/7/82 to 11/10/82.
Little work was undertaken on this licence, 50 km south of Watson Siding because of disappointing results on an adjacent area.-
Document
Published: 01 Jan 1982
-
Summary of previous exploration for stratiform copper within EL 871 Area B, South Australia.
Exploration licence 871 Area B contains Adelaidean sediments of the Callanna Beds, Burra Group and Umberatana Group overlying the Carpentarian Mount Painter Complex. The area is being investigated for stratiform copper mineralisation within the above...-
Document
-
Interpretation and evaluation of the Gunsight prospect.
Gunsight prospect was discovered in the late 1960s during the follow-up of anomalous copper detected by a stream sediment survey. In 1972-73 Dampier Mining Pty Ltd drilled eleven percussion holes (totalling 537 m) and eleven diamond holes (1764 m)...-
Document
-
Lake Frome area. Progress reports for the period 20/11/1969 to 19/11/1970.
Ongoing exploration for sedimentary uranium deposits and other radioactive minerals, in the plains area north-west of Lake Frome, consisted of the drilling and geophysical logging of 56 rotary holes for a total of 29,708 feet. Drillhole 355-1, which...-
Document
Published: 20 Aug 1970
-
Bald Hill - Inkerman - Whitwarta area. Progress reports for the period 29/9/1972 to 28/6/1973.
3 holes were drilled. Lignite was sampled and tested for wax, but this was of poor quality.-
Document
Published: 01 Jan 1973
-
Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
Copper Hill [and Cameron Hill]. Progress reports and joint final report to licence expiry/full surrender, for the period 12/10/1972 to 11/2/1974.
In a search for possible economic Permian coal seams buried at the southern end of the Boorthanna Trough of the Arckaringa Basin, the Petromin joint venture consortium selected an area to drill where it was inferred that such coal might lie within 300...-
Document
-
Scobie Hill. Progress reports to licence expiry/renewal, for the period 23/3/1973 to 22/3/1974.
New work undertaken on an area located near Manunda Homestead during the current licence period has been restricted by the need to try to attract a joint venture partner, efforts towards which have proved unsuccessful. A geological inspection of the...-
Document
-
Lake Hart. Progress reports to licence expiry/full surrender, for the period 5/9/1980 to 4/9/1982.
Airborne magnetic/radiometric surveys and follow-up gravity surveys carried out in a search for possible Olympic Dam type orebodies have indicated depths to magnetic basement in excess of 1000 m in the Lake Hart area of the Stuart Shelf. The...-
Document
Published: 06 Oct 1982
-
EL 272 Hamilton Creek. A regional assessment of the base metal potential of the Parabarana (to) Gunsight trend, and Callanna Beds (through) Yudnamutana sequence, northern Mount Painter Province, South Australia.
Aquitaine Australia Minerals Pty Ltd (Aquitaine) entered into a joint venture with North Flinders Mines on 21 August 1975, over an area defined by Exploration Licence 272 (ex EL 153). The area included two main prospective zones for copper deposits:...-
Document
-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document