Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
East Lake Frome, NSW. Final report on drilling programme 1976. (EL 887-896).
Fourteen stratigraphic holes were drilled in the eastern portion of the Frome Embayment in NSW.-
Document
-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Paralana Hill (part of the Poontana Uranium Joint Venture Project). Progress reports to licence expiry/renewal, for the period 19/12/1979 to 8/2/1983.
Targets of ongoing subsurface investigations in the plains area north-west of Lake Frome, now being conducted under a new joint venture, were respectively to delineate further sedimentary uranium occurrences within buried Middle and Late Tertiary...-
Document
-
Lake Frome. Progress reports to licence expiry/full surrender, for the period 18/12/1979 to 17/12/1981.
Ongoing exploration for possible Tertiary sediment-hosted roll front uranium occurrences in an area abutting western Lake Frome has consisted of the drilling of 7 open rotary holes for a total of 1384 m, to test ground midway between previously...-
Document
-
Lake Frome East. Progress and final reports to licence expiry/full surrender, for the period 30/9/1971 to 29/9/1972.
TARGET: Uranium in Tertiary sediments in the vicinity of Lakeside Bore. EXPLORATION: 2 vertical rotary mud holes for a total of 1044 feet were drilled and geophysically logged during September 1972. RESULTS: The radiometric logs did not show...-
Document
Published: 29 Sep 1972
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003