-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Data release - as updated : Nantuma. Annual reports plus final report to licence expiry/full surrender, for the period 21/12/2011 to 20/12/2021.
An area located ~12 km south-west of Warramboo on central Eyre Peninsula has been explored for possible buried economic Archaean stratabound iron ore, as well as for other, basement-hosted polymetallic mineral occurrences. During the first licence...-
Document
Published: 28 Dec 1921
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Buckleboo. Progress reports to licence expiry/full surrender, for the period 15/3/1983 to 14/3/1988.
TARGET: Lead-zinc-silver mineralisation of the Broken Hill or Aggeneys-Gamsberg type, associated with banded iron formations in Early Proterozoic metasediments; in addition, possible tin, tungsten or base metal-bearing skarns produced by hydrothermal...-
Document
-
Cootra. Progress and final reports to licence surrender for the period 25/11/80 to 28/3/84.
Pioneer exploration for possible stratabound base metal deposits that have a facies relationship to metamorphic iron deposits, which was carried out in the Cootra area, located 20 km east south-east of Warramboo on central Eyre Peninsula, has...-
Document
Published: 09 Apr 1984
-
Malache Well. Annual and final report for the period 30/10/92 to 29/10/93.
Base metal exploration in the Malache Well area, 15 km west-northwest of Tooligie, comprised follow-up soil sampling of geochemically anomalous areas (Zn, Pb, Ba, Ni, Co) delineated by previous exploration, but failed to repeat the results.-
Document
-
Mount Wedge. Progress and final reports to licence surrender for the period 12/10/88 to 27/5/92.
TARGET: Possible diamonds in the Mount Wedge region. EXPLORATION: Heavy mineral sampling, an airborne magnetic-radiometric survey, remote sensing Landsat TM plus aeromagnetic and radiometric data interpretation, detailed ground follow-up of more than...-
Document
-
Triple Hill. Progress reports to licence expiry/full surrender, for the period 10/7/1979 to 4/10/1982.
Exploration for possible buried occurrences of unconformity-related uranium mineralisation, undertaken within an area located approximately 26 km west-southwest of Cowell on eastern Eyre Peninsula, has included the acquistion during July 1979 of a 500...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Tumby Bay. Progress and annual reports to licence surrender, for the period 16/1/1980 to 28/12/1982.
TARGET: Epithermal and unconformity - type uranium in Archaean to Early Proterozoic rocks of the southern Gawler Craton. EXPLORATION: - an aerial magnetic and radioactivity survey flown at 800 m, 1600 m and 400m spacing by Austirex in November 1979;...-
Document
Published: 21 Feb 1983
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Central Gawler Gold Province Prospect Scale. Final report, Project ADI RD03-419 [Accelerated Discovery Initiative Round 3, 2022]. CSAMT and Loupe TEM Survey Method Assessment Report, February 2023.
Lady Alice Mines was successful in receiving funding in the third round of The Accelerated Discovery Initiative (ADI). This funding was provided to allow for the assessment of Controlled Source Audio-Magnetotellurics (CSAMT) and Loupe TEM ground...-
Document
Published: 28 Feb 1923
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Coulta. Progress reports and annual report to licence expiry/full surrender for the period 23/2/1978 to 22/3/1979.
Exploration for possible economic vein-style primary uranium deposits hosted within basement rocks in a licence area located 55 km west-northwest of Port Lincoln has consisted of detailed (1:10,000 scale) geological mapping over a 650 square km area,...-
Document
-
Cleve West. Progress reports and final report to licence full surrender, for the period 25/9/1979 to 27/1/1985.
The target within an area centred ~35 km north-west of Cleve was massive stratiform Broken Hill and Aggenys style base metals mineralisation associated with the Lower and Upper Middleback Jaspilite units of the Hutchison Group. A world class sized...-
Document
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document