Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
RB 77/00056 Willyama Complex excursion, 27th March to 7th April, 1977.
There is no abstract created for this record-
Document
Published: 01 Jan 1977
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Deep Well Dam. Annual reports and final report to licence full surrender, for the period 2/9/1994 to 13/4/2003.
The Deep Well Dam area, which lies 60 km north-northwest of Olary, is located within the Palaeoproterozoic Olary Domain and encompasses rock sequences prospective for stratabound Zn-Pb and Cu-Au mineralisation. Initial work performed there comprised...-
Document
-
Geological mapping of the Outalpa Inliers, Curnamona Province, South Australia.
Previous mapping and studies on lithology and lithostratigraphy of the Willyama Supergroup have utilised disparate classification schemes and vary greatly in quality and spatial accuracy for the geological data. In this study and report, they have...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Bonython Hill (part of the Border Project). Annual reports for the period 23/2/2007 to 18/5/2014.
During Year 7 of reporting, exploration work included two 1 km soil geochemical traverses, field inspection of Neogene palaeochannels and land access negotiations with landowners. Previous exploration in the region has recognised the correlation...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Bimbowrie. Annual reports for the period 4/11/2009 to 11/11/2018.
During licence Year 6 (2009-2010), the first year of tenure of renewed EL 4375, the main exploration activities undertaken by Sinosteel-PepinNini Curnamona Management Pty Ltd (SPCM) were to conduct two drilling campaigns, the first designed to...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 10/12/2009 to 9/12/2018.
An area consisting of three separate sub-blocks located ~20 to 35 km north-east of Olary and ~20 km east of Cutana is being explored for possible economic gold as basement shear and vein hosted style deposits, as well as for possible extensions of the...-
Document
-
Report on Dome Rock copper prospect, SA. Summary, stages 1, 2 and 3 results.
The area of interest for base metal exploration lies within a complex of Archaean metamorphic rocks intruded by undifferentiated granitic rocks of Archaean-Proterozoic age. The main exploration target is copper, but moderately rich silver, cobalt and...-
Document
-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Starvation Lake. Progress reports and final report to licence expiry/full surrender, for the period 28/10/1991 to 27/10/1993.
Exploration targeted Pb-Zn and Cu-Au mineralisation within covered extensions of the Broken Hill Block in the Starvation Lake area near the SA-NSW border. An aeromagnetic survey identified three targets which were followed up with ground magnetic...-
Document
Published: 15 Jul 1993
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona Project (uranium exploration spinoff). Joint annual reports for the period 1/1/2009 to 31/12/2011.
During the fifth year of the Curnamona - Uranium Project JV, during the 2009 calendar year, Curnamona Energy drilled a total of 124 holes for an aggregate depth of 11,777 m on EL 4262 (including RL 123). The drilling tested “blanket sands” at Oban...-
Document
-
Plumbago and Bimba. Progress reports, partial relinquishment reports and final report to licence full surrender, for the period 24/9/1978 to 25/1/1984.
Exploration for stratiform base metals in the Bimba Formation, and later for gold associated with banded iron formations of the Willyaman migmatitic Middle Gneiss Suite, has consisted of regional and detailed geological mapping, and mine tunnel,...-
Document
Published: 27 Jan 1984
-
Olary region. Progress and annual reports for the period 23/9/1976 to 22/9/1978.
Intensive exploration of granitoid environs in the Crocker Well area has outlined new areas of, and extended known areas of, primary uranium mineralization. A regional field evaluation was also made of the Glenorchy and Plumbago areas, leading to the...-
Document
-
Kalabity - Boolcoomata region. Progress reports and technical reports to licence expiry/renewal, for the period 1/7/1968 to 30/6/1970.
The sources of previously reported noteworthy radiometric anomalies located near Old Boolcoomata Homestead, which had been detected in 1962 during a SADME/BMR aerial scintiilometer survey, were investigated by the present joint venturers along with...-
Document
Published: 31 Jul 1970