-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
East Lake Frome, NSW. Final report on drilling programme 1976. (EL 887-896).
Fourteen stratigraphic holes were drilled in the eastern portion of the Frome Embayment in NSW.-
Document
-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 85/00008 Stratigraphic drilling of Cainozoic sediments near Lake Eyre, BMR 1983, well completion report.
10 fully cored shallow holes (total 543.2 m) were rotary mud drilled at four localities by the Australian Commonwealth Bureau of Mineral Resources (BMR) to elucidate the cover stratigraphy, particularly the upper age limit of the Etadunna Formation,...-
Document
Published: 01 Feb 1985
-
RB 81/00024 Progress report, CURNAMONA 1:250 000 sheet - Platform rocks, Benagerie Ridge and their Mesozoic and Cainozoic cover.
The Benagerie Ridge is a basement high which has been actively shedding detritus since Adelaidean times. It includes porphyry, with thin cover of Adelaidean rocks, flanked by Cambrian and possible Adelaidean sediments. The Cainozoic blankets the...-
Document
Published: 01 Jan 1981
-
RB 83/00056 Edeowie 1. Well completion report.
Edeowie 1 (TD 984 metres), which aimed to identify a series of seismic reflectors mapped by SADME beneath the eastern Lake Torrens piedmont plain, has intersected a stratigraphic sequence with features indicating that complex structural changes occur...-
Document
Published: 01 Jul 1983
-
RB 88/00020 1:250 000 geological series - Explanatory Notes CURNAMONA - South Australia.
The area mapped includes most of the area south of Lake Frome between the Flinders and Barrier Ranges, and part of the Olary Hills. Basin nomenclature has been revised for the Cainozoic. Drilling by CSR, Minad and Petromin NL has been used in the...-
Document
Published: 01 Apr 1988
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
Lake Callabonna area (part of the Lake Elder Project). First partial surrender report, for the period 19/3/1998 to 18/3/2001.
Exploration for sedimentary uranium consisted of research and compilation of previous drilling data, including lithological logs, gamma logs and redox interface distribution maps. Such information compiled from six historical drillholes located in...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Yarramba. Progress reports to licence expiry/renewal for the period 8/3/1976 to 7/3/1978.
Ongoing exploration for sedimentary uranium ore deposited in buried 1.5 - 6 km wide and 50 m thick Tertiary palaeochannels in the Yarramba area, located adjacent to the SA-NSW border 50 km northwest of Cockburn, included three detailed and...-
Document
Published: 17 Apr 1978