-
Tooligie - Verran, Ungarra and Darke Peake areas, south-eastern Eyre Peninsula. Combined partial surrender report for the period 12/11/1978 to 11/11/1982.
Exploration for unconformity-related uranium deposits has been performed within the subject ELs by Pancontinental Mining on behalf of joint venture partners since 1979. The initial exploration concept was to look for economic deposits occurring at or...-
Document
Published: 15 Nov 1982
-
RB 81/00091 Archaean to Middle Proterozoic geology of the southern Gawler Craton, South Australia. Excursion Guide.
This guidebook is divided into two parts; a brief resume of the regional geology of the southern Gawler Craton; and descriptions for each of the excursion stops. The Gawler Craton is a large region of continental crust which was cratonized ca 1400...-
Document
Published: 01 Sep 1981
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017
-
Data release (in part made in lieu of submitting a second partial surrender report) : Uno Range (part of the East Eyre Peninsula Project). Annual reports for the period 1/8/2011 to 31/7/2020.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 18 Dec 2020
-
Data release - as updated [made at SA Director of Mines' discretion] : Old Wartaka. Annual reports for the period 8/5/2013 to 7/5/2019.
A small area located on the eastern side of the Roopena Fault Zone, proximal to the south-eastern margin of the Gawler Ranges, is being explored for possible buried epigenetic gold and silver mineralisation, or IOCG type base metal sulphide...-
Document
Published: 13 May 2019
-
Mount Shannan. Annual reports to licence expiry/full surrender, for the period 19/2/2012 to 20/2/2016.
A very small area centred ~7.5 km north-northwest of Cleve has been explored for possible economic buried graphite mineralisation that might have formed within highly metamorphosed bedrock sediments located adjacent to large crustal penetrating...-
Document
Published: 02 Feb 2016
-
Moseley Nobs (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/3/2008 to 22/11/2019.
A small area originally comprising three separate parts centred ~20 km north of Kimba on northern Eyre Peninsula has been explored for possible economic Middleback Range type stratabound BIF hosted iron ore, for shear-hosted or Menninnie Dam style...-
Document
Published: 06 Dec 2019
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 2019
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 2019
-
Lake Gilles district (the Barna Joint Venture). Annual reports to licence full surrender, for the period 15/3/1993 to 12/7/2000.
Exploration of mainly buried Proterozoic metasedimentary bedrock for possible Broken Hill type Pb-Zn-Ag mineralisation and for Olympic Dam type Cu-Au mineralisation has been performed over two separate areas located 25 km north-east and 50 km east of...-
Document
Published: 11 Aug 2000
-
Kielpa (part of the Cowell Project). Annual reports and final report to licence expiry/full surrender, for the period 5/12/2005 to 20/3/2014.
An area centred about 25 km west of Cleve has been explored for possible buried Athabasca Basin type unconformity - style uranium mineralisation, which it was thought might have formed in a fairly deep (> 200 m) geological setting where...-
Document
Published: 18 Jun 2014
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 2009
-
Murninnie. Annual reports and final report to licence expiry/full surrender, for the period 19/4/2006 to 14/11/2013.
During August 2006, Australasia Gold acquired a 45% interest in the historic abandoned Murninnie copper mine (Private Mine 156) and a surrounding small exploration licence (EL 3542), which are located ~30 km south-southwest of Whyalla. In July 2007,...-
Document
Published: 13 Oct 2014
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 2021
-
Data release [made at SA Director of Mines' discretion] : Cockabidnie. Annual reports for the period 25/5/2016 to 24/5/2019.
An area covering the northern end of the Campoona Syncline is being explored for possible economic buried graphite formed within Palaeoproterozic schistose rocks, which may exist as northern extensions to the Central Campoona graphite resource as well...-
Document
Published: 26 May 2018
-
Midgee. Fourth partial surrender report, for the period 26/11/2003 to 24/3/2017.
Portions of two of three separate sub-blocks formerly comprising EL 5426, totalling 34 square km in area or ~25% of the licence's former extent, have been relinquished because of their now perceived diminished prospectivity for finding significant...-
Document
Published: 15 Feb 2017
-
Midgee. Fifth partial surrender report, for the period 26/11/2003 to 24/3/2019.
Portions of the western sub-block of EL 5426, totalling 27 square km in area or 27% of the licence's former extent, have been relinquished because of their now perceived diminished prospectivity for finding significant occurrences of uranium...-
Document
Published: 01 Feb 2019
-
Tumby Bay. Annual and final reports to licence expiry/full surrender for the period 8/9/2006 to 7/9/2009.
Exploration carried out primarily for possible economic uranium mineralisation within an area located approximately 40 km north-northeast of Port Lincoln started with reconnaissance aircore drilling during May 2007 (29 vertical holes for 590 m) to...-
Document
Published: 20 Mar 2010
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 2016