-
Lipson Cove - Tumby Bay area. Annual and final reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Geological mapping of an historically worked lamellar talc occurrence in the Tumby Bay area showed that snow white, finely flaky talc is present over a 2 km strike length within two beds of isoclinally folded schistose dolomitic limestone, but is of...-
Document
-
Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Mount Olinthus. Annual report to licence expiry/renewal, for the period 6/3/1995 to 5/3/1996.
Base metal mineralisation, indicated by newly discovered shafts at the historic Atkinson Pb-Ag-Cu-Zn mine, was the impetus for exploration in the upland area 20 km north-west from Cowell. Grab samples collected from shafts, stockpiles and dumps varied...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-12 - Corunna Station, north-eastern Eyre Peninsula, structurally controlled Mesoproterozoic epithermal Ag-Au and base metal prospects. Drilling final report.
Musgrave Minerals Ltd (MGV) is the holder of the subject EL 5497 Corunna North, located in the southern Gawler Ranges approximately 65 km west of Port Augusta and 10 km north of Iron Knob, where it is exploring for economic base and precious metal...-
Document
-
Nyllow Hill (near Tumby Bay). Progress and final reports for the period 2/9/88 to 1/9/90.
TARGET: Precious metals, specifically platinum group metals and gold, associated with ultrabasic intrusives and strongly faulted and altered metasediments in the Tumby Bay area. EXPLORATION: Geochemical sampling including rock chip, gravel and BCL...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo, Taringa, Nonning, Wipipippee and Menninnie Dam (the Menninnie Project). Joint annual reports for the period 1/1/2013 to 31/12/2016.
The Menninnie JV Project area consists of five contiguous exploration licences, and is considered prospective for Pb-Zn-Ag-Cu-Au-Mo-U deposits associated with past epithermal, porphyry, IOCG and skarn - forming geological environments. It lies in a...-
Document
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Franklin Harbour. Progress reports and final report to licence expiry/full surrender, for the period 26/2/1972 to 25/2/1973.
As part of an ongoing regional search of the eastern Eyre Peninsula for possible economic stratiform base and precious metal deposits, soil sampling and SP and IP surveys were carried out over previously identified, separate linear lead and zinc...-
Document
-
Pillaworta Hill. Progress and final reports for the period 22/12/1976 to 4/9/1978.
Investigation of banded iron formation in the Lincoln Uplands of the Tumby Bay district for possible South West African type base metal sulphide deposits consisted of rock chip and soil sampling at potential gossanous outcrops, and limited drilling of...-
Document
Published: 22 Jun 1978
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mosely Nobs (part of the East Eyre Peninsula Project). Annual reports for the period 5/7/2006 to 4/7/2016.
A licence area now consisting of two separate small blocks located about 60 km west of Whyalla was taken up, along with other ground in the region, because it is thought to have potential for the discovery of uranium associated with Olympic Dam style...-
Document
-
Peterlumbo. First partial surrender report for the period 1/9/1999 to 31/8/2001.
Gold and copper were the targets of exploration in the Peterlumbo Hill area, 40 km north of Kimba. 581 calcrete samples collected at 400 m centres outlined broad anomalous areas at > 5 ppb Au. Limited rock chip sampling, and 200 m infill calcrete...-
Document
-
Rudall. Data release made in lieu of submitting a second partial surrender report : annual reports for the period 22/12/1995 to 22/1/2005; plus a (subsequently added) combined annual and final report to licence expiry/full surrender on 22/1/2006.
Exploration of three small licence subareas located near Cleve, Rudall and Verran has targeted possible Palaeoproterozoic stratiform or hydrothermal base and precious metal deposits hosted within Hutchison Group metasediments. Interpretation of 1979...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-36, Dingo Hill (Cariewerloo Basin) Palaeozoic / Mesoproterozoic unconformity - related uranium mineral prospects. Project interim and final reports.
The Dingo Hill prospect lies within the eastern Gawler Craton, approximately 90 km west of Port Augusta. EL 3579 licensee Hindmarsh Resources is exploring for possible economic secondary stratiform uranium mineralisation associated with regional...-
Document
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document