-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
RB 56/00004 Preliminary report on proposed cuttings, Port Pirie-Broken Hill railway Ucolta-Paratoo deviation - SA Railways.
The regional geology along the deviation is described and a programme for testing the proposed cuttings is presented. The presence of potentially useful deposits of rock for ballast near the route is noted and comment is made on the composition of...-
Document
Published: 01 Jan 1963
-
Caralue. Progress reports to licence surrender for the period 30/8/2002 to 20/2/2004.
A 140 square km area located about 30 km south-west of Kimba was taken up to explore for economic gypsum mineralisation in Recent surficial sediments. After performing aerial photointerpretation to identify prospective landforms, field inspection...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Oakbank, Sergeant's Dam and Oakvale (part of the Oakvale Project). Joint first partial surrender report, for the period 3/12/1997 to 15/7/1999.
Exploratory drilling to search for heavy mineral sands, performed over an area extending to 160 km north and north-west of Renmark, has targeted marginal marine placer deposits of detrital rutile, ilmenite and zircon in potential Loxton - Parilla Sand...-
Document
-
Oakbank, Sergeant's Dam and Oakvale, northern Murray Basin, South Australia (part of the Oakvale Project). Joint third partial surrender report, for the period 3/12/1997 to 1/12/2001.
Within the now relinquished licence portions, parts of six traverses of reverse circulation aircore drilling (involving 68 vertical open holes, total 1918.5 m) tested 60 km strike length of interpreted heavy mineral sand - bearing marine beach facies...-
Document
-
Mount Fitton Talc Province. Progress, annual and miscellaneous technical summary reports for the period 16/2/79 to 24/11/96.
Talc has been mined at Mount Fitton in the northern Flinders Ranges on a continuous basis since 1945, for industrial use in the manufacture of cosmetics, ceramics and refractory ware. From 1979 to 1996, under authority of a series of Exploration...-
Document
-
Mount Plantagenet. Progress reports to licence expiry/full surrender, for the period 11/2/1971 to 10/2/1973.
Ongoing exploration for economic epigenetic and syngenetic copper occurrences in the vicinity of the Worumba Diapir, east of Hawker, has concentrated on field mapping, soil and channel sampling and shallow percussion drilling (47 holes for 3755+ feet)...-
Document
Published: 23 May 1972
-
Wilkinson. Annual reports plus final report to licence expiry/full surrender, for the period 4/1/1999 to 3/1/2002.
Possible potash and halite resources in evaporite - rich sediment sequences of the Tallaringa Trough, lying at depths that might be suitable for solution mining, were the initial targets of exploration in the Wilkinson Lakes area. Following a...-
Document
-
Olary (part of the Braemar Iron Project). Annual reports to licence expiry/cancellation, for the period 20/9/2010 to 19/9/2015.
A licence area in the Olary district comprising three separate sub-blocks has been explored for possible economic stratabound iron ore occurrences within partly concealed Neoproterozoic bedrock. The subject ground was taken up by Wentworth Metals...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Mount Grainger (part of the Mount Grainger JV Project). Annual reports for the period 25/10/1996 to 24/10/2000.
Exploration over a structurally complex part of the Nackara Arc region centred ~30 km north-east of Peterborough has sought economic Telfer-type gold deposits hosted within folded domal structures in Adelaidean strata, which have been intruded during...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY8-30 - Eucla Basin Eocene and Pleistocene low-stand beach ridge marine heavy mineral placer prospects. Drilling project final report.
The Nundroo Range and Bookabie Range are prominent south-west facing, yet effectively previously undrilled, preserved palaeogeomorphic beach ridge /coastal dune features which are located ~200 km west of Ceduna and ~100 km south of the...-
Document
-
Mount Neville. Progress and final reports to licence expiry/full surrender for the period 17/3/1969 to 16/3/1970.
Inspection of an area showing diapiric and fault disturbance within upper Adelaidean and Lower Cambrian metasediments in the vicinity of Mount Neville sought to find barite deposits of sufficiently high grade and quantity to resemble those of the...-
Document
-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Hope Bank. Progress reports and final report to licence full surrender, for the period 6/1/1987 to 6/9/1988.
TARGET: Telfer-style gold in the Wabricoola area, NW of Yunta. EXPLORATION: Image processing of BMR airborne magnetic survey data, and detailed stream sediment (452) and soil (110) geochemical sampling. RESULTS: Anomalous low order gold values that...-
Document
Published: 25 Aug 1988