-
Mount Sabine. Partial surrender report for the period 12/2/1981 to 22/1/1986.
As part of a regional diamond and kimberlite exploration programme, 50 drainage and loam samples were collected for heavy mineral analysis from within the two areas being relinquished, which lie respectively 50 km NW and 40 km NE of Kingoonya. No...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 79/00114 Palaeodrainage systems in western South Australia. Their detection by Landsat imagery, stratigraphic significance and economic potential.
Two major palaeodrainage systems of Tertiary age, with watersheds of up to 35 000 square km and channel lengths of 200-250 km, have been recognised and delineated using LANDSAT imagery, during 1:250 000 scale geological mapping in western South...-
Document
Published: 01 Jan 1980
-
RB 97/00039 Lineament tectonic data, South Australia, with a focus on the Cooper Basin.
The lineament mapping methods used by E.S.T. (Tim) O'Driscoll, which were a crucial factor in the discovery of Olympic Dam, the world's largest known Cu-U-Au-Ag deposit, and of several other lesser Australian metallic orebodies, have now been applied...-
Document
Published: 01 Oct 1997
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Ediacara Range. Annual reports and final report to licence expiry/full surrender, for the period 5/6/1997 to 4/6/1999.
No significant gold or base metal values were returned from geochemical sampling of quartz and barite veins in the vicinity of the Ediacara Fault, 40 km north-west of Parachilna. Imaging of aeromagnetic data purchased as infill coverage to a 1999...-
Document
-
Koolcutta. Annual reports and final report to licence expiry/full surrender, for the period 30/4/1997 to 29/4/2002.
Rock chip and calcrete sampling were the main methods of exploration for iron oxide - associated copper-gold mineralisation in an area 60 km west of Port Augusta. Initial rock chip sampling returned no anomalous Au values, but gave best results of...-
Document
-
Reconnaissance structural investigation of the southern Stuart Shelf, South Australia.
Photogeological fracture analysis, Landsat interpretation and aerial geophysical data interpretation techniques have been concurrently applied to the problem of identifying deep-seated linear structures on the Stuart Shelf. Results of a consultant's...-
Document
Published: 06 Nov 1981
-
Todds Dam (part of the Lake Torrens Project). Second partial surrender report, for the period 10/3/2004 to 29/4/2016.
Approximately 61% of a small licence area located immediately north-west of the Olympic Dam deposit has been relinquished under the terms of the Lake Torrens Project Amalgamated Expenditure Agreement. Only minimal work has been performed on the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 18/9/1979 to 17/9/1981.
Continued exploration for stratabound base metals across an area of the southern Stuart Shelf, extending west and north-west of Port Augusta, has included an evaluation of the results of previous stratigraphic drilling on the prior-held EL 332, plus...-
Document
Published: 16 Nov 1981
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Mount Sabine and Snow Hill [Billa Kalina joint venture]. Joint final surrender report for the period 21/3/83 to 20/3/87.
Diamond exploration in the Bon Bon - Millers Creek region, about 80 km north-northeast of Kingoonya, included Landsat imagery and photogeological studies plus extensive reconnaissance soil and stream sediment sampling. No kimberlitic indicator...-
Document
-
Oolgelima Hill. Progress and final reports to licence expiry/full surrender for the period 15/10/1986 to 14/10/1987.
During the fifteenth and sixteenth quarters of tenure of EL 1165, exploration for possible Olympic Dam style basement-hosted base and precious metals in the Giddi Giddinna Creek area, 20 km north-east of Coober Pedy, comprised making an aerial...-
Document
Published: 30 Jun 1987
-
Fiddle Hill. Progress reports to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
TARGET: Olympic Dam style Cu-Au-U mineralisation lying on a linear gravity feature extending south of Lake Macfarlane, which has associated magnetic discontinuities; unconformity - related sedimentary U at the Pandurra Formation/Gawler Range Volcanics...-
Document
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Pernatty Ridge. Progress reports to licence expiry/full surrender, for the period 13/12/1989 to 12/12/1991.
Possible stratabound, Kupferschiefer - style copper sulphide within the basal sediments of the early Neoproterozoic Tapley Hill Formation was the target of exploration in the Pernatty Ridge area. Aberfoyle's work has comprised a review of existing...-
Document
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document