-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Kiana Gravity Survey. Contractor's acquisition report.
2 lines of a detailed gravity survey were acquired over a regional gravity anomaly at Kiana on south-western Eyre Peninsula, but the planned full survey coverage was aborted when it was found that the target gravity anomaly was spurious, having arisen...-
Document
-
Mount Ive (part of the Eyre Peninsula Uranium Joint Venture Project). Final report at licence expiry/full surrender, for the period 19/4/2006 to 18/10/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements was to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling were to be used to...-
Document
-
Data release - as updated : Caralue. Annual reports and final report to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2013.
An area centred 40 km west of Kimba has been explored initially for basement gold and nickel mineralisation, and following a joint venture, for possible IOCG and palaeochannel uranium mineralisation. During the first year of tenure, reconnaissance...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
Data release : Yaninee. Annual reports submitted until the commencement of joint reporting for the Eyre Peninsula Joint Venture Project, for the period 9/10/2000 to 8/10/2003.
Exploration Licence 2752 Yaninee on the northern Eyre Peninsula of South Australia was acquired by Adelaide Resources Limited to secure vacant ground adjacent to EL 2845 Minnipa (previously EL 2188) where exploration by Adelaide Resources early in...-
Document
-
Kimba. First partial surrender report, for the period 6/11/2006 to 5/11/2013.
321 square km of the former area of EL 4938 has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’ resistance to mineral exploration....-
Document
Published: 23 Jan 2014
-
Kottata Well (latterly a part of the Yaninee Project). First partial surrender report, for the period 29/9/2003 to 28/9/2005.
This licence, located ~30 km north-east of Venus Bay on western Eyre Peninsula, was taken out to explore for possible iron oxide - associated copper-gold deposits hosted in Proterozoic igneous basement. Basement rock exposures are very scarce within...-
Document
-
Lock. Annual reports to licence expiry/full surrender, for the period 19/8/2005 to 1/11/2013.
Exploration for possible basement-hosted iron ore within an area centred approximately 45 km east-northeast of Lock has consisted only of the acquisition of semi-detailed gravity data. The licence ground lies just to the north of the interpreted...-
Document
Published: 25 Nov 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Cocata and Palkagee Well. Annual reports and final reports to licences' joint expiry/full surrender, for the period 1/12/2005 to 30/11/2010.
Exploration carried out over two adjacent areas located 50 to 70 km south-west and south of Wudinna was progressed under the terms of two separate joint venture agreements made by the licensee in October 2006, firstly with GE Resources (a subsidiary...-
Document
Published: 27 Jan 2011
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 2010
-
Cockabidnie North. Annual reports to licence expiry/full surrender, for the period 18/1/2006 to 17/1/2010.
A small (11 square km) area located approximately 40 km south of Kimba has been explored for possible economic uranium, gold or base metal deposits, including Menninnie Dam style lead-zinc-silver mineralisation, that may have formed in Archaean to...-
Document
Published: 12 Mar 2010
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
Mount Ive and Corrobinnie (part of the Eyre Peninsula Uranium Joint Venture Project). Joint first partial surrender report, for the period 19/4/2006 to 11/7/2010.
Exploration of the Tertiary Thurlga Palaeochannel for possible roll front type sedimentary uranium mineralisation has occurred principally on EL 3546 Mount Ive, the northern half of which has now been relinquished along with a tiny part of EL 3833...-
Document
Published: 28 Feb 2011
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 2007